Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD10-01004
StatusFinaled
Name ROPER INVESTMENT COMPANY
Site Address 130 N 8TH ST
Project NameCapitol Terrace 1st floor
Customer Number 
ePlanReviewNo
Description
(Vanilla Finish - Capitol Terrace Buidling) Permit is to split an existing 3,794 square foot into two tenant spaces; the south space will be 1,846 square feet and the north space will be 1,369 square feet. Approval contingent upon adhering to the approved plans on file. Work to include: installation of new non-rated tenant separation wall, installation of new ramped front entry (per CZC10-00090) and finishes in compliance with chapter 8 of the 2006 IBC. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. NOTE: This permit is a vanilla finish with no occupancy declared. Additional permits will be required before a Certificate of Occupancy can be issued. PLAN MODIFICATION 5-24-10 - Modification submitted to remodel restrooms to make them accessible to the maximum extent technically feasible. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/7/20107/7/20107/7/2010APASS
DetailsDave Hannah
DOC - Permit Finaled7/7/20107/7/20107/7/2010PPASS
DetailsDave Hannah
FIRE-Final Inspection7/6/20107/6/20107/6/2010PPASS
DetailsForrest France
Fire life safety for the vanilla shell sutie 130 passed. See BLD10-01076 for adjacent suite 132.
BLD-Final7/2/20107/6/20107/6/2010ANR
DetailsDave Hannah
Ben Roper Phone #: ###-#### needs fire finals
BLD-Final7/1/20107/2/20107/2/2010PDEFR
DetailsJim Storey
Ben Roper Phone #: ###-#### to 425 for 7/6
FIRE-Final Inspection7/1/20107/2/20107/2/2010PNR
DetailsForrest France
Missing address numbers, site work in progress, need demo and project related fire sprinkler permit finals first.
BLD-Framing/Rough-in6/9/20106/10/20106/10/2010PPART
DetailsDave Hannah
Ben Phone #: ###-#### ok to cover rest rooms
BLD-Conference5/13/20105/14/20105/14/2010APASS
DetailsDave Hannah
ben Phone #: ###-####