BLD-Aging Inspection | 10/27/2011 | 10/27/2011 | 10/27/2011 | | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 8/18/2011 | 8/19/2011 | 8/19/2011 | A | PASS |
Dave Hannah
|
|
|
dustin Phone #: ###-#### ok for cc
|
FIRE-Final Inspection | 8/9/2011 | 8/9/2011 | 8/9/2011 | P | PASS |
Forrest France
|
|
|
Fire life safety inspection passed.
|
BLD-Final | 8/8/2011 | 8/9/2011 | 8/9/2011 | P | PART |
Dave Hannah
|
|
|
jerry Phone #: ###-#### ok for temp occ need to add two hand rails find out from arct about ada grab bars and the rating on server room
|
FIRE-Final Inspection | 8/5/2011 | 8/8/2011 | 8/8/2011 | A | PART |
Forrest France
|
|
|
Verified prior correction items are finished. Final pending project related fire alarm permit.
|
FIRE-Final Inspection | 8/4/2011 | 8/5/2011 | 8/5/2011 | A | FAIL |
Troy Cobbley
|
|
|
Need final sign off for the fire alarm permit. Also I found a manual pull station at the north exit fo the gym that is mounted too high. There are two emergency lights that need the batteries hooked up and one combo exit sign/emergency light that is located over the main exit that did not function. The exit sign from the gym back into the school is missing as well.
|
FIRE-Conference | 7/29/2011 | 7/29/2011 | 7/29/2011 | A | DONE |
Forrest France
|
|
|
Regarding project related fire alarm permit work.
|
FIRE-Sprinkler Rough-in | 7/20/2011 | 7/20/2011 | 7/21/2011 | P | PART |
Forrest France
|
|
|
Ref. stamped fire sprinkler plans for red-line annotations regarding areas okayed for cover on the 1st and 2nd floors to date.
|
BLD-Framing/Rough-in | 7/14/2011 | 7/15/2011 | 7/15/2011 | A | PART |
Dave Hannah
|
|
|
jerry Phone #: ###-#### ceiling grid ok to cover second floor ok to all but kitchen on first floor after fire oks
|
BLD-Other | 7/13/2011 | 7/13/2011 | 7/13/2011 | P | PASS |
Dave Hannah
|
|
|
Jerry Phone #: ###-####ceiling grid ok to cover after fire oks
|
BLD-Framing/Rough-in | 6/15/2011 | 6/16/2011 | 6/16/2011 | A | PART |
Dave Hannah
|
|
|
jerry Phone #: ###-#### ok to cover roof over entery
|
FIRE-Sprinkler Rough-in | 6/6/2011 | 6/6/2011 | 6/6/2011 | P | PART |
Forrest France
|
|
|
UG fire supply line okayed for bury.
|
BLD-Framing/Rough-in | 5/24/2011 | 5/24/2011 | 5/24/2011 | P | PART |
Dave Hannah
|
|
|
jerry - as early as possible please Phone #: ###-#### strapes on each end of low roof east end of bldg ok to cover roof
|
FIRE-Sprinkler Rough-in | 5/10/2011 | 5/10/2011 | 5/11/2011 | A | PART |
Forrest France
|
|
|
Ref. stamped fire sprinkler plans for locations inspected at the 1st and 2nd floors. Also discussed coverage at combustible concealed spaces and exceptions allowed per NFPA 13.
|
BLD-Energy code compliance | 5/6/2011 | 5/9/2011 | 5/9/2011 | A | PASS |
Dave Hannah
|
|
|
jerry Phone #: ###-#### new addition area
|
BLD-Framing/Rough-in | 5/2/2011 | 5/3/2011 | 5/3/2011 | A | PART |
Dave Hannah
|
|
|
Jerry Phone #: ###-#### shear in east stair tower ok to cover
|
BLD-Energy code compliance | 4/27/2011 | 4/27/2011 | 4/27/2011 | P | PASS |
Dave Hannah
|
|
|
jerry Phone #: ###-#### east startower
|
BLD-Framing/Rough-in | 4/25/2011 | 4/26/2011 | 4/26/2011 | A | PART |
Dave Hannah
|
|
|
jerry Phone #: ###-#### ok to insulate east stair tower
|
BLD-Framing/Rough-in | 4/13/2011 | 4/14/2011 | 4/14/2011 | A | PART |
Dave Hannah
|
|
|
jerry Phone #: ###-####west stair tower shear sheeting ok to cover
|
BLD-Framing/Rough-in | 4/11/2011 | 4/11/2011 | 4/12/2011 | P | PART |
Dave Hannah
|
|
|
Jerry Phone #: ###-#### ok to cover second floor walls
|
BLD-Framing/Rough-in | 4/1/2011 | 4/1/2011 | 4/4/2011 | P | PART |
Dave Hannah
|
|
|
Jerry Phone #: ###-####framing on west stair tower ok to cover
|
BLD-Framing/Rough-in | 3/28/2011 | 3/29/2011 | 3/30/2011 | A | PART |
Dave Hannah
|
|
|
jerry Phone #: ###-#### ok to cover ext on new addition
|
BLD-Framing/Rough-in | 3/23/2011 | 3/23/2011 | 3/23/2011 | P | FAIL |
Dave Hannah
|
|
|
jerry Phone #: ###-#### ext nailing on new section
|
BLD-Framing/Rough-in | 3/22/2011 | 3/22/2011 | 3/23/2011 | P | PART |
Dave Hannah
|
|
|
jerry Phone #: ###-#### fire blocking on first floor furred out walls ok to cover first couple of rooms needs to use larger peices of insulation so they will stay in place on the rest
|
BLD-Framing/Rough-in | 3/18/2011 | 3/21/2011 | 3/21/2011 | A | PART |
Dave Hannah
|
|
|
JERRY Phone #: ###-#### ok to cover ext walls on 1 first floor
|
BLD-Framing/Rough-in | 3/16/2011 | 3/17/2011 | 3/17/2011 | P | CANC |
Dave Hannah
|
|
|
brock Phone #: ###-####///canceled by Mr Hine at 9 A.M.
|
BLD-Other | 3/15/2011 | 3/15/2011 | 3/15/2011 | P | PART |
Tony Young
|
|
|
jerry - roof sheating Phone #: ###-####,, roof nailing on the addition ok.. per plans
|
BLD-Framing/Rough-in | 3/7/2011 | 3/8/2011 | 3/8/2011 | A | PART |
Dave Hannah
|
|
|
jerry Phone #: ###-#### floor framing for ada ramp on second floor
|
FIRE-Conference | 3/7/2011 | 3/7/2011 | 3/8/2011 | A | NR |
Forrest France
|
|
|
|
BLD-Framing/Rough-in | 2/11/2011 | 2/14/2011 | 2/14/2011 | A | PASS |
Dave Hannah
|
|
|
JERRY Phone #: ###-#### roof straping and parapet connections ok to cover
|
BLD-Framing/Rough-in | 2/10/2011 | 2/11/2011 | 2/14/2011 | A | FAIL |
Dave Hannah
|
|
|
Jerry Hine Phone #: ###-#### still needs to make connections
|
BLD-Framing/Rough-in | 2/8/2011 | 2/9/2011 | 2/10/2011 | A | PART |
Dave Hannah
|
|
|
jerry Phone #: ###-#### roof bracing see on site plans for locations ok to cover
|
BLD-Framing/Rough-in | 1/24/2011 | 1/25/2011 | 1/26/2011 | P | PART |
Dave Hannah
|
|
|
Jerry Hine Phone #: ###-#### roof straping and bracing see plans on site for locations
|
BLD-Framing/Rough-in | 1/24/2011 | 1/24/2011 | 1/24/2011 | P | PART |
Dave Hannah
|
|
|
gerry Phone #: ###-#### floor in library ok to cover
|
BLD-Framing/Rough-in | 1/19/2011 | 1/20/2011 | 1/20/2011 | A | PART |
Mike Jordan
|
|
|
jerry Phone #: ###-####. Parapet connections, simpson H8 to stell I beams at roof area C North and east parapets.
|
BLD-Framing/Rough-in | 1/18/2011 | 1/19/2011 | 1/19/2011 | A | PART |
Dave Hannah
|
|
|
Jerry Phone #: ###-####room straping east end of upper roof ok
|
BLD-Framing/Rough-in | 1/18/2011 | 1/18/2011 | 1/18/2011 | P | PART |
Dave Hannah
|
|
|
jerry Phone #: ###-#### floor and ceiling connections see plan for locations
|
BLD-Aging Inspection | 12/15/2010 | 12/15/2010 | 12/20/2010 | | PASS |
Dave Hannah
|
|
|
work in progress
|
BLD-Footing | 10/14/2010 | 10/15/2010 | 10/16/2010 | A | PART |
Dave Hannah
|
|
|
jerry - late morning please Phone #: ###-#### crew working on walls mti will be on site to inspect rebar and test concrete
|
BLD-Foundation | 9/30/2010 | 10/1/2010 | 10/1/2010 | P | PART |
Dave Hannah
|
|
|
Jerry Hine--Pour at 1:30 Phone #: ###-#### elev pit mti will be on site to inspect rebar and test concrete
|