Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD10-01036
StatusFinaled
Name IND SCHOOL DIST OF BOISE CITY
Site Address 908 E JEFFERSON ST
Project NameRoosevelt Elementary
Customer Number 
ePlanReviewNo
Description
Roosevelt Elementary School - (Addition and Remodel) - To insulate the crawl space and basement walls with 6" batt insulation and new 6 mil. vapor retarder at the crawl space floors. To construct a new elevator equipment room in the basement boiler room and a new tele/com room within the maintenance room, as well as, relocate the existing kiln to the east side of the boiler room. To demo and remodel the first floor to redo the accessible restrooms, eliminate the existing kitchen area, relocate the faculty lounge, offices and nurse area to the north side of the corridor and to remove and replace all interior and exterior stairways and ramps, including all railings. To demo and remove the stage area from the south side of the gymnasium. To demo and remodel the second floor to redo the accessible restrooms, add two resource rooms, replace interior stairs with new accessible ramp along corridor #222. To remove and replace existing exterior egress stairway from the library. This permit is also to install new roofing and all new exterior windows and doors, as well as, all new interior finishes throughout. To construct a new 2,140 square foot, two story, wood framed addition, with a 285 square foot elevated loading dock on the northeast corner of the existing building. The addition will have 1,095 square foot warming and serving kitchen on the first floor and a new 1,045 square foot classroom #207 on the second floor. The addition will also include a new elevator in a masonry shaft. This permit also includes related electrical, plumbing and mechanical work, as well as, related site improvements. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection10/27/201110/27/201110/27/2011 PASS
DetailsDave Hannah
BLD-Final8/18/20118/19/20118/19/2011APASS
DetailsDave Hannah
dustin Phone #: ###-#### ok for cc
FIRE-Final Inspection8/9/20118/9/20118/9/2011PPASS
DetailsForrest France
Fire life safety inspection passed.
BLD-Final8/8/20118/9/20118/9/2011PPART
DetailsDave Hannah
jerry Phone #: ###-#### ok for temp occ need to add two hand rails find out from arct about ada grab bars and the rating on server room
FIRE-Final Inspection8/5/20118/8/20118/8/2011APART
DetailsForrest France
Verified prior correction items are finished. Final pending project related fire alarm permit.
FIRE-Final Inspection8/4/20118/5/20118/5/2011AFAIL
DetailsTroy Cobbley
Need final sign off for the fire alarm permit. Also I found a manual pull station at the north exit fo the gym that is mounted too high. There are two emergency lights that need the batteries hooked up and one combo exit sign/emergency light that is located over the main exit that did not function. The exit sign from the gym back into the school is missing as well.
FIRE-Conference7/29/20117/29/20117/29/2011ADONE
DetailsForrest France
Regarding project related fire alarm permit work.
FIRE-Sprinkler Rough-in7/20/20117/20/20117/21/2011PPART
DetailsForrest France
Ref. stamped fire sprinkler plans for red-line annotations regarding areas okayed for cover on the 1st and 2nd floors to date.
BLD-Framing/Rough-in7/14/20117/15/20117/15/2011APART
DetailsDave Hannah
jerry Phone #: ###-#### ceiling grid ok to cover second floor ok to all but kitchen on first floor after fire oks
BLD-Other7/13/20117/13/20117/13/2011PPASS
DetailsDave Hannah
Jerry Phone #: ###-####ceiling grid ok to cover after fire oks
BLD-Framing/Rough-in6/15/20116/16/20116/16/2011APART
DetailsDave Hannah
jerry Phone #: ###-#### ok to cover roof over entery
FIRE-Sprinkler Rough-in6/6/20116/6/20116/6/2011PPART
DetailsForrest France
UG fire supply line okayed for bury.
BLD-Framing/Rough-in5/24/20115/24/20115/24/2011PPART
DetailsDave Hannah
jerry - as early as possible please Phone #: ###-#### strapes on each end of low roof east end of bldg ok to cover roof
FIRE-Sprinkler Rough-in5/10/20115/10/20115/11/2011APART
DetailsForrest France
Ref. stamped fire sprinkler plans for locations inspected at the 1st and 2nd floors. Also discussed coverage at combustible concealed spaces and exceptions allowed per NFPA 13.
BLD-Energy code compliance5/6/20115/9/20115/9/2011APASS
DetailsDave Hannah
jerry Phone #: ###-#### new addition area
BLD-Framing/Rough-in5/2/20115/3/20115/3/2011APART
DetailsDave Hannah
Jerry Phone #: ###-#### shear in east stair tower ok to cover
BLD-Energy code compliance4/27/20114/27/20114/27/2011PPASS
DetailsDave Hannah
jerry Phone #: ###-#### east startower
BLD-Framing/Rough-in4/25/20114/26/20114/26/2011APART
DetailsDave Hannah
jerry Phone #: ###-#### ok to insulate east stair tower
BLD-Framing/Rough-in4/13/20114/14/20114/14/2011APART
DetailsDave Hannah
jerry Phone #: ###-####west stair tower shear sheeting ok to cover
BLD-Framing/Rough-in4/11/20114/11/20114/12/2011PPART
DetailsDave Hannah
Jerry Phone #: ###-#### ok to cover second floor walls
BLD-Framing/Rough-in4/1/20114/1/20114/4/2011PPART
DetailsDave Hannah
Jerry Phone #: ###-####framing on west stair tower ok to cover
BLD-Framing/Rough-in3/28/20113/29/20113/30/2011APART
DetailsDave Hannah
jerry Phone #: ###-#### ok to cover ext on new addition
BLD-Framing/Rough-in3/23/20113/23/20113/23/2011PFAIL
DetailsDave Hannah
jerry Phone #: ###-#### ext nailing on new section
BLD-Framing/Rough-in3/22/20113/22/20113/23/2011PPART
DetailsDave Hannah
jerry Phone #: ###-#### fire blocking on first floor furred out walls ok to cover first couple of rooms needs to use larger peices of insulation so they will stay in place on the rest
BLD-Framing/Rough-in3/18/20113/21/20113/21/2011APART
DetailsDave Hannah
JERRY Phone #: ###-#### ok to cover ext walls on 1 first floor
BLD-Framing/Rough-in3/16/20113/17/20113/17/2011PCANC
DetailsDave Hannah
brock Phone #: ###-####///canceled by Mr Hine at 9 A.M.
BLD-Other3/15/20113/15/20113/15/2011PPART
DetailsTony Young
jerry - roof sheating Phone #: ###-####,, roof nailing on the addition ok.. per plans
BLD-Framing/Rough-in3/7/20113/8/20113/8/2011APART
DetailsDave Hannah
jerry Phone #: ###-#### floor framing for ada ramp on second floor
FIRE-Conference3/7/20113/7/20113/8/2011ANR
DetailsForrest France
BLD-Framing/Rough-in2/11/20112/14/20112/14/2011APASS
DetailsDave Hannah
JERRY Phone #: ###-#### roof straping and parapet connections ok to cover
BLD-Framing/Rough-in2/10/20112/11/20112/14/2011AFAIL
DetailsDave Hannah
Jerry Hine Phone #: ###-#### still needs to make connections
BLD-Framing/Rough-in2/8/20112/9/20112/10/2011APART
DetailsDave Hannah
jerry Phone #: ###-#### roof bracing see on site plans for locations ok to cover
BLD-Framing/Rough-in1/24/20111/25/20111/26/2011PPART
DetailsDave Hannah
Jerry Hine Phone #: ###-#### roof straping and bracing see plans on site for locations
BLD-Framing/Rough-in1/24/20111/24/20111/24/2011PPART
DetailsDave Hannah
gerry Phone #: ###-#### floor in library ok to cover
BLD-Framing/Rough-in1/19/20111/20/20111/20/2011APART
DetailsMike Jordan
jerry Phone #: ###-####. Parapet connections, simpson H8 to stell I beams at roof area C North and east parapets.
BLD-Framing/Rough-in1/18/20111/19/20111/19/2011APART
DetailsDave Hannah
Jerry Phone #: ###-####room straping east end of upper roof ok
BLD-Framing/Rough-in1/18/20111/18/20111/18/2011PPART
DetailsDave Hannah
jerry Phone #: ###-#### floor and ceiling connections see plan for locations
BLD-Aging Inspection12/15/201012/15/201012/20/2010 PASS
DetailsDave Hannah
work in progress
BLD-Footing10/14/201010/15/201010/16/2010APART
DetailsDave Hannah
jerry - late morning please Phone #: ###-#### crew working on walls mti will be on site to inspect rebar and test concrete
BLD-Foundation9/30/201010/1/201010/1/2010PPART
DetailsDave Hannah
Jerry Hine--Pour at 1:30 Phone #: ###-#### elev pit mti will be on site to inspect rebar and test concrete