Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD10-01041
StatusFinaled
Name SHIELD CONSTRUCTION
Site Address 1499 W HAYS ST
Project NameIDAHO EPILEPSY & NEUROLOGY
Customer Number 
ePlanReviewNo
Description
(IDAHO EPILEPSY & NEUROLOGY) Remodel of an existing 3,788 sq. ft. main floor W/ 732 sq. ft. basement tenant space for new medical office tenant in existing building per approved plans. Work to include select interior demolition & removal of 4 exterior doors & infill with fixed glazing in openings; installation of structural beams & supportper engineering & plans; 1-hour fire-resistive rating on ceiling & frame side of walls of basement storage area & stair access/egress serving basement, W/ self-closing 3/4 Hour rated door & frame at bottom of stairs; new interior walls to create offices, reception/waiting, exam, staff restroom, accessible public restrooms, HI-LO drinking fountain, break room & basement storage room. New exterior roof membrane, HVAC, and accessible route to include new concrete ramp & rails; electrical, mechanical & plumbing upgrades; replace exterior facia & wood facade elements. All per reviewed plans, red-line notes on plans and all attached plan review comments / conditions of all reviewing agencies. Maintain existing attic draft-stop. drs DRH10-00055
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/2/201012/2/201012/2/2010PPASS
DetailsTony Young
TONY Phone #: ###-####
BLD-Final12/1/201012/2/201012/2/2010APASS
DetailsTony Young
TONY Phone #: ###-####
BLD-Final11/30/201012/1/201012/1/2010ACANC
DetailsTony Young
TONY Phone #: ###-####
FIRE-Final Inspection11/29/201011/30/201011/30/2010APASS
DetailsForrest France
Correction notice items field verified for completion. Fire life safety passed.
FIRE-Final Inspection11/23/201011/24/201011/24/2010PFAIL
DetailsForrest France
Items noted include; post one fire extinguisher at the basement level, provide approved door hardware at the first floor east exit door, remove the chevron at exit sign in the hall for dual direction per plan, install closure and seal at the rated basement door, remove the drawbridge and associated equipment at the basement stairway in non-compliance with egress requirements per IFC 2006.
BLD-Conference11/23/201011/23/201011/23/2010PPASS
DetailsTony Young
Tony Phone #: ###-####,, ?s on final
BLD-Conference11/2/201011/2/201011/1/2010PPART
DetailsTony Young
Conference with contractor on cabinet heights. Cabinets that are workstations in an exam room are exempt from ADA height requirements provided they are not needed/used by the patient during the examination. Greater height then identified on approved plans allowed in these exam rooms.
BLD-Other10/26/201010/27/201010/27/2010APASS
DetailsTony Young
Tony Phone #: ###-####,, ceiling grid
BLD-Other10/26/201010/26/201010/26/2010PPART
DetailsTony Young
Tony Phone #: ###-####,, need mech pass in ceiling 1st,, then ok
BLD-Energy code compliance9/28/20109/29/20109/29/2010APASS
DetailsTom Arcoraci
tony Phone #: ###-#### - late morning please
BLD-Energy code compliance9/23/20109/24/20109/24/2010ANR
DetailsTony Young
Tony Phone #: ###-####
BLD-Energy code compliance9/22/20109/23/20109/23/2010ANR
DetailsTony Young
Tony Phone #: ###-####
BLD-Framing/Rough-in9/21/20109/22/20109/22/2010APART
DetailsTony Young
Tony Phone #: ###-####,, walls ok to insulate,, connect plates