BLD-Final | 11/18/2010 | 11/19/2010 | 11/19/2010 | A | PASS |
Jim Sly
|
|
|
Gene Phone #: ###-#### C/C issued
|
DOC - Permit Finaled | 11/19/2010 | 11/19/2010 | 11/19/2010 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 11/15/2010 | 11/15/2010 | 11/15/2010 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection passed.
|
FIRE-Final Inspection | 11/12/2010 | 11/12/2010 | 11/15/2010 | P | PASS |
Forrest France
|
|
|
Fire life safety is satisfactory pending approved style door hardware at the exit from the new enclosed 207ft2 addition is provided. Project related FIR permits are finaled.
|
BLD-Other | 11/5/2010 | 11/5/2010 | 11/5/2010 | P | PASS |
Jim Sly
|
|
|
GENE Phone #: ###-#### Grid OK
|
BLD-Conference | 10/12/2010 | 10/14/2010 | 10/26/2010 | P | PART |
Dave Hannah
|
|
|
jeff Phone #: ###-#### talked about bld no. 7 T/Is
|
BLD-Other | 10/21/2010 | 10/21/2010 | 10/21/2010 | P | PASS |
Jim Sly
|
|
|
###-#### Gene Ceiling grid OK
|
BLD-Framing/Rough-in | 10/20/2010 | 10/21/2010 | 10/21/2010 | A | CANC |
Jim Sly
|
|
|
gene - ceiling grid Phone #: ###-#### Re-sched PM
|
FIRE-Conference | 10/19/2010 | 10/19/2010 | 10/20/2010 | P | DONE |
Forrest France
|
|
|
Regarding project completion schedule.
|
FIRE-Conference | 10/7/2010 | 10/8/2010 | 10/8/2010 | A | DONE |
Forrest France
|
|
|
On site conference regarding project schedule.
|
BLD-Framing/Rough-in | 9/21/2010 | 9/21/2010 | 9/21/2010 | P | PART |
Jim Sly
|
|
|
Ceiling grid inspection for cover please-Gene Phone #: ###-#### Select ceiling grid at toner lab East end.
|
BLD-Framing/Rough-in | 8/20/2010 | 8/23/2010 | 8/23/2010 | A | PART |
Jim Sly
|
|
|
Gene Phone #: ###-#### Hall and Mech room.....
|
BLD-Framing/Rough-in | 8/10/2010 | 8/10/2010 | 8/10/2010 | P | PART |
Jim Sly
|
|
|
Gene-Toner room please Phone #: ###-####.....OK
|