Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD10-01120
StatusFinaled
Name HC COMPANY INC
Site Address 11311 W CHINDEN BLVD
Project NameHP#5 ADDITION
Customer Number410001-4004
ePlanReviewNo
Description
(HEWLETT PACKARD)(BUILDING 5SS - INDIGO LABS) Remodel within a 4,200 sq. ft. area in existing building for relocated/reconfigured Indigo lab test chamber, presses and support areas; to add enclosed area of 207 sq. ft. to include new reinforced concrete footing/piers & slab; steel columns, beams & roof deck; standing metal seam roof & insulated perimeter wall panels; construct interior walls to create Toner Collection room, Mechanical Room, Indigo Lab Chamber and Press Room; to add new doors & hardware or modify existing doors and hardware; interior wall, floor & ceiling finishes; upgrade of electrical, mechanical, plumbing, sprinkler & alarm systems; all per approved plans. Mechanical equipment / ducting modifications / additions are to serve the needs of the Indigo Testing Lab and support areas environmental requirements. NOTE: This building fully fire sprinklered for allowable area increase, unlimited area with 60' all around. Separate applications, plans, approvals and permits are required before any work can be performed on the sprinkler and alarms systems as regulated by the Fire Department. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/18/201011/19/201011/19/2010APASS
DetailsJim Sly
Gene Phone #: ###-####
C/C issued
DOC - Permit Finaled11/19/201011/19/201011/19/2010PPASS
DetailsJim Sly
FIRE-Final Inspection11/15/201011/15/201011/15/2010APASS
DetailsForrest France
Fire life safety inspection passed.
FIRE-Final Inspection11/12/201011/12/201011/15/2010PPASS
DetailsForrest France
Fire life safety is satisfactory pending approved style door hardware at the exit from the new enclosed 207ft2 addition is provided. Project related FIR permits are finaled.
BLD-Other11/5/201011/5/201011/5/2010PPASS
DetailsJim Sly
GENE Phone #: ###-####
Grid OK
BLD-Conference10/12/201010/14/201010/26/2010PPART
DetailsDave Hannah
jeff Phone #: ###-#### talked about bld no. 7 T/Is
BLD-Other10/21/201010/21/201010/21/2010PPASS
DetailsJim Sly
###-#### Gene Ceiling grid OK
BLD-Framing/Rough-in10/20/201010/21/201010/21/2010ACANC
DetailsJim Sly
gene - ceiling grid Phone #: ###-####
Re-sched PM
FIRE-Conference10/19/201010/19/201010/20/2010PDONE
DetailsForrest France
Regarding project completion schedule.
FIRE-Conference10/7/201010/8/201010/8/2010ADONE
DetailsForrest France
On site conference regarding project schedule.
BLD-Framing/Rough-in9/21/20109/21/20109/21/2010PPART
DetailsJim Sly
Ceiling grid inspection for cover please-Gene Phone #: ###-####
Select ceiling grid at toner lab East end.
BLD-Framing/Rough-in8/20/20108/23/20108/23/2010APART
DetailsJim Sly
Gene Phone #: ###-####
Hall and Mech room.....
BLD-Framing/Rough-in8/10/20108/10/20108/10/2010PPART
DetailsJim Sly
Gene-Toner room please Phone #: ###-####.....OK