BLD-Final | 9/10/2010 | 9/13/2010 | 9/13/2010 | P | PASS |
Mike Jordan
|
|
|
Scott Phone #: ###-####. ok for perm. occ.
|
FIRE-Final Inspection | 9/10/2010 | 9/13/2010 | 9/13/2010 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 9/9/2010 | 9/10/2010 | 9/10/2010 | P | NR |
Mike Jordan
|
|
|
Scott Phone #: ###-####
|
FIRE-Final Inspection | 9/9/2010 | 9/10/2010 | 9/10/2010 | A | FAIL |
Forrest France
|
|
|
See fire code review notes items # 5, 6, 11, and 30 for items in need of revision including knox box, address numbers, EM lighting, signage at the riser room door. Replace ceiling at the comm room and provide missing escutcheon.
|
BLD-Framing/Rough-in | 9/7/2010 | 9/7/2010 | 9/7/2010 | P | PASS |
Mike Jordan
|
|
|
2hr. fire wall at canopy and remainder on tennant side.
|
BLD-Framing/Rough-in | 9/3/2010 | 9/7/2010 | 9/7/2010 | A | PART |
Mike Jordan
|
|
|
SCOTT Phone #: ###-####. Remainder of 2hr. firewall on tenant side. work in progress.
|
BLD-Framing/Rough-in | 8/25/2010 | 8/26/2010 | 8/26/2010 | P | PASS |
Mike Jordan
|
|
|
Ceiling grid ok.
|
BLD-Conference | 8/25/2010 | 8/25/2010 | 8/25/2010 | P | DONE |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 8/18/2010 | 8/18/2010 | 8/18/2010 | A | PASS |
Mike Jordan
|
|
|
INterior steel stud walls for riser room.
|
BLD-Framing/Rough-in | 8/13/2010 | 8/13/2010 | 8/13/2010 | P | CANC |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 8/13/2010 | 8/13/2010 | 8/13/2010 | A | CANC |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 8/12/2010 | 8/12/2010 | 8/12/2010 | P | PASS |
Mike Jordan
|
|
|
REmainder of slip joint at 2hr. firebarrier wall.
|
BLD-Framing/Rough-in | 8/11/2010 | 8/11/2010 | 8/11/2010 | P | PASS |
Mike Jordan
|
|
|
Interior steel stud framed walls and hardlid only. Contractor now has the required 90 minute door frames for the 2hr. fire barrier wall. Also verified class C smoke and flame spread for kraft paper.
|
BLD-Framing/Rough-in | 8/11/2010 | 8/11/2010 | 8/11/2010 | A | CANC |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 8/10/2010 | 8/10/2010 | 8/10/2010 | P | FAIL |
Mike Jordan
|
|
|
Needs to provide listed door frame in 2hr. firebarrier wall. Correction notice issued.
|
BLD-Framing/Rough-in | 8/10/2010 | 8/10/2010 | 8/10/2010 | A | PART |
Mike Jordan
|
|
|
Slip joint at roof deck, south wall for 2hr. firebarrier wall, also 3rd layer of 5/8 type x rock at south firebarrier wall.
|
BLD-Framing/Rough-in | 8/9/2010 | 8/9/2010 | 8/10/2010 | A | PART |
Mike Jordan
|
|
|
Slip joint at roof deck behind restroom framing at 2hr. firebarrier wall. 1st and 2nd layers of 5/8 type x rock on north wall behind restroom framing.
|
BLD-Framing/Rough-in | 8/9/2010 | 8/9/2010 | 8/9/2010 | P | PART |
Mike Jordan
|
|
|
1st and 2nd. layers of 5/8 type x rock for 2hr. fire barrier wall, south wall. Also went over flame spread and smoke development requirments for bamboo and exposed paper at ceiling over insulation.
|
BLD-Framing/Rough-in | 8/5/2010 | 8/6/2010 | 8/9/2010 | P | CANC |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 8/5/2010 | 8/6/2010 | 8/6/2010 | A | PART |
Mike Jordan
|
|
|
!st layer of 5/8 type x rock for 2hr. firebarrier wall, south portion.
|
BLD-Framing/Rough-in | 8/4/2010 | 8/5/2010 | 8/5/2010 | P | NR |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 8/4/2010 | 8/5/2010 | 8/5/2010 | A | PART |
Mike Jordan
|
|
|
2nd and 3rd layers of 5/8 type x rock for 2hr. fire barrier wall at restroom area and 1st and 2nd layers at return at north wall exterior side.
|
BLD-Framing/Rough-in | 8/3/2010 | 8/4/2010 | 8/4/2010 | P | PART |
Mike Jordan
|
|
|
1st layer of 5/8 type x rock and all patch backs ok for 2hr. fire barrier wall, tenant side.
|
BLD-Framing/Rough-in | 8/3/2010 | 8/4/2010 | 8/4/2010 | A | DONE |
Mike Jordan
|
|
|
Scott Phone #: ###-####. On site conferance regarding 2hr. fire barrier wall and construction schdeule.
|
BLD-Footing | 7/29/2010 | 7/30/2010 | 7/30/2010 | P | PASS |
Jim Sly
|
|
|
scott - early afternoon if possible Phone #: ###-#### 3 footing pads for new columns....OK.
|