Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD10-01230
StatusFinaled
Name GOLIS CONSTRUCTION
Site Address 350 N 9TH ST
Project NameJEFFERSON PLACE
Customer Number 
ePlanReviewNo
Description
(JEFFERSON PLACE) - NOTE: Existing egress paths serving existing tenants & northeast stair enclosure shall be maintained safe and be usable as required exits throughout the scope of work for this project along W. Jefferson Street. Addendum to project for the bridge & railings, etc. to serve as LATTA, Inc. 2nd exit is a DEFERRED SUBMITTAL to be handled /processed in compliance with Sec. 106.3.4, 2006 IBC. Contractor is responsible for compliance with Chapter 33, 2006 IBC & Ch. 14, 2006 IFC. Scope of work includes select demolition & replacement of structural slab and sidewalk over existing basement on Jefferson St. side & 9th per reviewed plans.. Work to include demolition of existing concrete walk / basement storage roof; cleaning of existing structural beams and re-priming; construction of 3 reinforced concrete tree wells / structural beam support; installation of galvanized or phosphatized/painted Formlock steel deck; install HSS5x5x5/16 tube steel structural support below existing steel beam in line with building wall line; place reinforced concrete over steel deck, place protective membrane and install new sidewalk & street lights. All per reviewed plans and structural engineers analysis and design details. Special Inspections required as specified on Sheet S1.1 and attached "Project Start Up For special Inspection" document provided by structural engineer. This building is fully sprinklered to allow the fifth story. Separate applications and permits are required before any modification to the sprinkler or alarm system can begin, as regulated by the fire department. NOTE: Need copy of ACHD signed agreement or approval letter before permit can be issued. drs DRH10-00104
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/28/20122/28/20122/29/2012PPASS
DetailsDave Hannah
DOC - Permit Finaled2/29/20122/29/20122/29/2012APASS
DetailsDave Hannah
BLD-Aging Inspection2/28/20122/28/20122/28/2012 PEND
DetailsDave Hannah
FIRE-Conference7/11/20117/11/20117/11/2011ADONE
DetailsForrest France
Project related FIR permits are finaled- fire life safety inspection needed.
FIRE-Conference7/6/20117/6/20117/6/2011PCANC
DetailsForrest France
John-PLease co-ordinate with Building inspector Phone #: ###-#### *Note- incorrect permit number requested**
BLD-Conference7/6/20117/6/20117/6/2011PCANC
DetailsJim Storey
John-Please co-ordinate with the Fire inspector Phone #: ###-####
BLD-Wall cover6/27/20116/27/20116/27/2011PCANC
DetailsDave Hannah
John Phone #: ###-####
BLD-Aging Inspection4/6/20114/6/20114/14/2011 PASS
DetailsDave Hannah
talked with brandon he will get finals ###-####
BLD-Aging Inspection12/28/201012/28/201012/28/2010 PASS
DetailsDave Hannah
BLD-Aging Inspection10/27/201010/27/201010/27/2010 PASS
DetailsDave Hannah
BLD-Footing8/25/20108/26/20108/26/2010APART
DetailsDave Hannah
bryan Phone #: ###-#### tree wells crew still working on forms and rebar using specal inspection all work is to plans