BLD-Final | 9/22/2010 | 9/24/2010 | 9/24/2010 | A | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 9/24/2010 | 9/24/2010 | 9/24/2010 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 9/21/2010 | 9/22/2010 | 9/21/2010 | A | CANC |
Mike Jordan
|
|
|
Mike Phone #: ###-####
|
BLD-Framing/Rough-in | 9/2/2010 | 9/3/2010 | 9/3/2010 | A | PASS |
Mike Jordan
|
|
|
Mike Phone #: ###-####
|
BLD-Concrete | 8/16/2010 | 8/17/2010 | 8/17/2010 | P | PASS |
Mike Jordan
|
|
|
Mike Phone #: ###-####. INterior column pad footings. ok. Wiil be placed with interior slab on grade.
|
BLD-Footing | 8/11/2010 | 8/12/2010 | 8/12/2010 | A | PASS |
Mike Jordan
|
|
|
Mike Phone #: ###-####South footing and stemwall.
|
BLD-Concrete | 8/9/2010 | 8/10/2010 | 8/10/2010 | A | PASS |
Mike Jordan
|
|
|
Michael Phone #: ###-####. Perimeter stemwalls ok.
|
BLD-Footing | 8/4/2010 | 8/6/2010 | 8/6/2010 | A | PART |
Mike Jordan
|
|
|
CJ Pierce- around 11:30-12 if possible please Phone #: ###-####. Permiter footing ok, work inprogress on installing reinforcment at column pad footings.
|