BLD-Final | 8/18/2010 | 8/18/2010 | 8/18/2010 | P | PASS |
Jim Sly
|
|
|
Nancy Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 8/18/2010 | 8/18/2010 | 8/18/2010 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Conference | 8/11/2010 | 8/11/2010 | 8/11/2010 | P | DONE |
Troy Cobbley
|
|
|
I met the door hardware contractor on site to verify hardware on the main exit.
|
BLD-Final | 7/20/2010 | 7/21/2010 | 7/21/2010 | A | NR |
Mike Jordan
|
|
|
NANCY Phone #: ###-####. Life/safety failed.
|
FIRE-Final Inspection | 7/20/2010 | 7/20/2010 | 7/20/2010 | P | FAIL |
Troy Cobbley
|
|
|
Repair or remove both of the exit signs, remove the thumbturn lock on the east exit door, provide approved single action hardware on the east exit door, provide automatic flush bolts and sticker on one pair of the north exit doors. The other pair shall have no locking device, including manual flush bolts. Single action hardware for both leaves of doors would be ok.
|