BLD-Final | 8/20/2010 | 8/20/2010 | 8/20/2010 | P | PASS |
Tom Arcoraci
|
|
|
glenn - please call 1/2 hr prior Phone #: ###-####
|
DOC - Permit Finaled | 8/20/2010 | 8/20/2010 | 8/20/2010 | P | PASS |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 8/20/2010 | 8/20/2010 | 8/20/2010 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. I notified Glenn with Darigold that if the new racking that was stacked out in the parking lot was to be installed inside new plans would be required.
|
BLD-Conference | 8/6/2010 | 8/6/2010 | 8/6/2010 | P | PASS |
Tom Arcoraci
|
|
|
Glenn-Please call at least 30 mins prior to inspection Phone #: ###-####
|
FIRE-Final Inspection | 8/5/2010 | 8/6/2010 | 8/6/2010 | A | FAIL |
Troy Cobbley
|
|
|
Maximum storage height signs are to be posted as discussed. Also the new fire sprinkler and fire alarm monitoring system shall be signed off/approved prior to utilizing the racking system. I gave my approval for using the floor area in the racks.
|
BLD-Final | 8/5/2010 | 8/6/2010 | 8/6/2010 | P | CANC |
Tom Arcoraci
|
|
|
glen - please call 1/2 hr prior so he can meet you there Phone #: ###-####
|