BLD-Final | 12/2/2010 | 12/3/2010 | 12/3/2010 | P | PASS |
Mike Jordan
|
|
|
Christina Phone #: ###-####. ok for perm. occ.
|
BLD-Final | 10/22/2010 | 10/22/2010 | 10/22/2010 | P | PART |
Mike Jordan
|
|
|
Christina Phone #: ###-####. Ok for temp. occ.
|
FIRE-Final Inspection | 10/21/2010 | 10/21/2010 | 10/21/2010 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 10/19/2010 | 10/19/2010 | 10/19/2010 | P | FAIL |
Troy Cobbley
|
|
|
Provide single action approved hardware on the front exit door
|
FIRE-Final Inspection | 10/18/2010 | 10/19/2010 | 10/19/2010 | A | FAIL |
Troy Cobbley
|
|
|
Left message on contacts voice mail. Went to the project site but it was locked up with no access. No inspection was performed. jim Phone #: ###-####
|
BLD-Other | 10/11/2010 | 10/11/2010 | 10/11/2010 | P | PASS |
Jim Sly
|
|
|
jim - ceiling grid Phone #: ###-####
|
BLD-Framing/Rough-in | 9/7/2010 | 9/7/2010 | 9/7/2010 | P | PASS |
Mike Jordan
|
|
|
Shear nailing inspection please-Jim Phone #: ###-####. patch backs at 2hr. firewall ok.
|
BLD-Framing/Rough-in | 8/30/2010 | 8/30/2010 | 8/30/2010 | P | PASS |
Mike Jordan
|
|
|
Jim Phone #: ###-####. INterior steel studs for restroom and massage room only.
|
BLD-Conference | 8/18/2010 | 8/19/2010 | 8/19/2010 | A | PASS |
Mike Jordan
|
|
|
Jim-Regarding metal studs Phone #: ###-####. ok to reuse the proposed metal studs.
|