BLD-Final | 11/28/2012 | 11/28/2012 | 11/28/2012 | P | PASS |
Jim Storey
|
|
|
Brian in Public Works has approved site drainage. All other trades approved ok for issuance of CO.
|
BLD-Final | 9/25/2012 | 9/25/2012 | 9/25/2012 | P | NR |
Tom Arcoraci
|
|
|
Jesse Phone #: ###-####
|
FIRE-Final Inspection | 9/19/2012 | 9/24/2012 | 9/24/2012 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Aging Inspection | 7/19/2012 | 7/19/2012 | 7/20/2012 | | DEFR |
Jim Storey
|
|
|
. I deferred him to Scott Arellano for approval
|
FIRE-Conference | 4/18/2012 | 4/18/2012 | 4/18/2012 | P | DONE |
Troy Cobbley
|
|
|
Met Jesse on site and went over door hardware requirements and fire extinguisher requirements. He wants to supply the new fire hydrant from the west side of the site insteand of from a main on the south side. I deferred him to Scott Arellano for approval. He is hoping to have this completed within 3 weeks.
|
BLD-Other | 4/2/2012 | 4/2/2012 | 4/2/2012 | A | PART |
Jim Storey
|
|
|
Plumbing and electrical have been approved. Fire hydrant installation required for final occupancy.
|
FIRE-Conference | 3/14/2012 | 3/15/2012 | 3/15/2012 | A | DONE |
Troy Cobbley
|
|
|
I stopped at job site and the receptionist contacted Jesse and we spoke over the phone about getting the life safety inspection performed. He stated that the new fire hydrant would not be installed for another 3 weeks. I set up a re-inspection conference for three weeks from now for a follow up.
|
BLD-Conference | 2/2/2012 | 2/2/2012 | 2/2/2012 | P | PART |
Jim Storey
|
|
|
droped off c/o requist card. jessi out of town will be back monday is to contact j gilland or j blaze.
|
BLD-Final | 1/17/2012 | 1/18/2012 | 1/18/2012 | A | PART |
Jim Storey
|
|
|
John Phone #: ###-#### building ok for final letter from engineer on file. fire line and bearm to be instaled soon. pending all sign offs.
|
BLD-Other | 10/28/2011 | 10/28/2011 | 10/31/2011 | P | NR |
Jim Storey
|
|
|
Check Status. Ready for final? 110.5 Inspection requests. It shall be the duty of the holder of the building permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspections of such work that are required by this code.
|
BLD-Conference | 9/28/2011 | 9/29/2011 | 9/29/2011 | A | PASS |
Jim Storey
|
|
|
john Phone #: ###-#### reviewed plan and hardware will be ready for insp. next week.
|
BLD-Other | 8/2/2011 | 8/3/2011 | 8/3/2011 | A | PASS |
Jim Storey
|
|
|
See what we can do to final this permit out. conf. jesse w/knife river should be complet in 2 wk.
|