BLD-Final | 8/10/2011 | 8/10/2011 | 8/11/2011 | P | PASS |
Jim Sly
|
|
|
Dave phone ###-#### OK for Perm Occ.
|
BLD-Final | 8/9/2011 | 8/10/2011 | 8/10/2011 | A | CANC |
Jim Sly
|
|
|
dave Phone #: ###-#### Re-sched for PM.
|
BLD-Final | 6/15/2011 | 6/16/2011 | 6/16/2011 | A | PART |
Jim Sly
|
|
|
Dave Phone #: ###-#### OK for Temp Occ. OK for Perm Occ. when Plumbing Perms.
|
BLD-Conference | 6/9/2011 | 6/10/2011 | 6/10/2011 | A | PASS |
Jim Sly
|
|
|
Please call 30min prior--Dave Phone #: ###-####
|
FIRE-Final Inspection | 6/6/2011 | 6/7/2011 | 6/7/2011 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 6/3/2011 | 6/6/2011 | 6/6/2011 | P | FAIL |
Troy Cobbley
|
|
|
Provide emergency lighting in the stair way and provide non-locking hardware on inner exit door as discussed.
|
BLD-Other | 4/1/2011 | 4/4/2011 | 4/4/2011 | A | PASS |
Jim Sly
|
|
|
Dave Phone #: ###-#### Grid OK
|
BLD-Framing/Rough-in | 2/2/2011 | 2/3/2011 | 2/3/2011 | A | PASS |
Jim Sly
|
|
|
DAve Phone #: ###-#### Grid OK
|
BLD-Framing/Rough-in | 2/1/2011 | 2/1/2011 | 2/1/2011 | A | PASS |
Jim Sly
|
|
|
Dave phone #: ###-####
|
BLD-Framing/Rough-in | 1/28/2011 | 1/31/2011 | 2/1/2011 | A | DEFR |
Jim Storey
|
|
|
Dave-please talk to Mike Jordan prior to inspection Phone #: ###-####
|
BLD-Energy code compliance | 1/28/2011 | 1/28/2011 | 1/28/2011 | P | PASS |
Mike Jordan
|
|
|
Dave Phone #: ###-####
|
BLD-Other | 12/21/2010 | 12/22/2010 | 12/23/2010 | P | PASS |
Jim Sly
|
|
|
dave - roof shear nail and wall shear nail Phone #: ###-####
|
BLD-Foundation | 11/12/2010 | 11/15/2010 | 11/15/2010 | A | PASS |
Jim Sly
|
|
|
Bill phone
|
BLD-Foundation | 11/10/2010 | 11/12/2010 | 11/12/2010 | P | CANC |
Jim Sly
|
|
|
bill Phone #: ###-#### Re-sched.......
|
BLD-Footing | 11/10/2010 | 11/12/2010 | 11/12/2010 | A | PASS |
Jim Sly
|
|
|
bill Phone #: ###-####
|