Permit Information
Permit NumberBLD10-02103
StatusFinaled
Name CREATIVE ACCESS ART CENTER-PHASE I
Site Address 500 S 8TH ST
Project NameCREATIVE ACCESS ART CENTER
Customer Number 
ePlanReviewNo
Description
(CREATIVE ACCESS ART CENTER) This building is fire sprinklered to allow the open basement and for fire area reasons. To remodel an existing building for a new office tenant (7,104 square foot 1st story and 7,141 square foot basement). Work is to include 2 restrooms accessible to the disabled, interior nonbearing walls, upgrades to the exterior ramp, and a high/low drinking fountain accessible to the disabled. The access to an existing freight elevator on both the basement and 1st story levels will be walled up. The basement is approved for storage only. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. A new fire sprinkler service will be provided to serve the existing fire sprinkler system that is currently served through the building on the South, across a property line. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. As an office occupancy, quick-response heads are required throughout the 1st story. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Extend Permit 90/180 days 8/31/20118/31/2011 DONE
DetailsJason Blais
60 day extension--See request scanned into documents 8-29-11//BAS
BLD-Conference8/24/20118/24/20118/24/2011PPASS
DetailsDave Hannah
Dave-please talk to Evelyn Mason regarding the temp occ expiring on MON 8-29-11-I''ve left 2 messages and Jason wants you to see if you can reach her. I talked with Evelyn the board meet on thusday if they ok the money she has a plumber ready to finish the work she will call jason next week
BLD-Aging Inspection7/13/20117/13/20117/13/2011 DEFR
DetailsDave Hannah
waiting on plumbing
BLD-Aging Inspection5/13/20115/13/20115/18/2011 PEND
DetailsDave Hannah
plumbing mis is the hold up
BLD-Final2/23/20112/24/20112/24/2011APART
DetailsDave Hannah
after 10am//Evelyn or cell # ###-#### Phone #: ###-#### everthing is ok but still needs a plumbing final
BLD-Aging Inspection2/9/20112/9/20112/9/2011 PASS
DetailsDave Hannah
FIRE-Final Inspection12/6/201012/6/201012/6/2010PPASS
DetailsForrest France
Correction items field verified for completion, fire life safety passed. Final hardware install at the east exit to be verified at structural final inspection as agreed.
BLD-Final12/6/201012/6/201012/6/2010PPART
DetailsDave Hannah
jason Phone #: ###-#### ok for temp occ needs to fix ada restrooms
BLD-Final12/3/201012/6/201012/6/2010ANR
DetailsDave Hannah
jason Phone #: ###-#### needs other trades finaled
BLD-Final11/30/201012/3/201012/3/2010PNR
DetailsDave Hannah
jason Phone #: ###-####
FIRE-Final Inspection11/30/201012/3/201012/3/2010AFAIL
DetailsForrest France
Correction items include provide approved hardware at the main entry/exit door, remove manual surface and thumbturn locks at the west basement exit door, repair exit sign/EM light at the basement, doors/ hardware and ramp at the east exit are not yet installed or finished.
FIRE-Conference11/26/201011/26/201011/26/2010PPART
DetailsForrest France
Project related fire alarm and sprinkler permits finaled.
BLD-Framing/Rough-in11/15/201011/18/201011/18/2010PPASS
DetailsDave Hannah
jason Phone #: ###-####