Extend Permit 90/180 days | | 8/31/2011 | 8/31/2011 | | DONE |
Jason Blais
|
|
|
60 day extension--See request scanned into documents 8-29-11//BAS
|
BLD-Conference | 8/24/2011 | 8/24/2011 | 8/24/2011 | P | PASS |
Dave Hannah
|
|
|
Dave-please talk to Evelyn Mason regarding the temp occ expiring on MON 8-29-11-I''ve left 2 messages and Jason wants you to see if you can reach her. I talked with Evelyn the board meet on thusday if they ok the money she has a plumber ready to finish the work she will call jason next week
|
BLD-Aging Inspection | 7/13/2011 | 7/13/2011 | 7/13/2011 | | DEFR |
Dave Hannah
|
|
|
waiting on plumbing
|
BLD-Aging Inspection | 5/13/2011 | 5/13/2011 | 5/18/2011 | | PEND |
Dave Hannah
|
|
|
plumbing mis is the hold up
|
BLD-Final | 2/23/2011 | 2/24/2011 | 2/24/2011 | A | PART |
Dave Hannah
|
|
|
after 10am//Evelyn or cell # ###-#### Phone #: ###-#### everthing is ok but still needs a plumbing final
|
BLD-Aging Inspection | 2/9/2011 | 2/9/2011 | 2/9/2011 | | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 12/6/2010 | 12/6/2010 | 12/6/2010 | P | PASS |
Forrest France
|
|
|
Correction items field verified for completion, fire life safety passed. Final hardware install at the east exit to be verified at structural final inspection as agreed.
|
BLD-Final | 12/6/2010 | 12/6/2010 | 12/6/2010 | P | PART |
Dave Hannah
|
|
|
jason Phone #: ###-#### ok for temp occ needs to fix ada restrooms
|
BLD-Final | 12/3/2010 | 12/6/2010 | 12/6/2010 | A | NR |
Dave Hannah
|
|
|
jason Phone #: ###-#### needs other trades finaled
|
BLD-Final | 11/30/2010 | 12/3/2010 | 12/3/2010 | P | NR |
Dave Hannah
|
|
|
jason Phone #: ###-####
|
FIRE-Final Inspection | 11/30/2010 | 12/3/2010 | 12/3/2010 | A | FAIL |
Forrest France
|
|
|
Correction items include provide approved hardware at the main entry/exit door, remove manual surface and thumbturn locks at the west basement exit door, repair exit sign/EM light at the basement, doors/ hardware and ramp at the east exit are not yet installed or finished.
|
FIRE-Conference | 11/26/2010 | 11/26/2010 | 11/26/2010 | P | PART |
Forrest France
|
|
|
Project related fire alarm and sprinkler permits finaled.
|
BLD-Framing/Rough-in | 11/15/2010 | 11/18/2010 | 11/18/2010 | P | PASS |
Dave Hannah
|
|
|
jason Phone #: ###-####
|