BLD-Final | 9/23/2010 | 9/23/2010 | 9/23/2010 | P | PASS |
Dave Hannah
|
|
|
vicki Phone #: ###-####
|
FIRE-Final Inspection | 9/21/2010 | 9/23/2010 | 9/23/2010 | A | PASS |
Forrest France
|
|
|
Corrections field verified, fire life safety passed.
|
FIRE-Conference | 9/22/2010 | 9/22/2010 | 9/22/2010 | P | DONE |
Forrest France
|
|
|
Project related fire alarm work for the AES panel has been finaled.
|
FIRE-Final Inspection | 9/14/2010 | 9/16/2010 | 9/16/2010 | A | FAIL |
Troy Cobbley
|
|
|
Provide passing final inspection for the building related fire alarm permit for the installation of th AES panel. Remove the thumbturn deadbolt from the main exit. Keyed is ok. Meet with Perry for the revised floor plan.
|