FIRE-Final Inspection | 7/1/2011 | 7/1/2011 | 7/1/2011 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 6/29/2011 | 6/30/2011 | 6/30/2011 | A | PASS |
Tom Arcoraci
|
|
|
Call before arrival please--Cathy Phone #: ###-####
|
BLD-Final | 5/12/2011 | 5/13/2011 | 5/13/2011 | P | PART |
Tom Arcoraci
|
|
|
Renee Phone #: ###-#### cn issued stairs and signs
|
FIRE-Final Inspection | 5/12/2011 | 5/13/2011 | 5/13/2011 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until the work is complete as per the city approved documents. A fire extinguisher is to be mounted at the lower level.
|
FIRE-Final Inspection | 5/10/2011 | 5/10/2011 | 5/11/2011 | A | NR |
Forrest France
|
|
|
|
FIRE-Final Inspection | 5/5/2011 | 5/9/2011 | 5/9/2011 | P | NR |
Forrest France
|
|
|
Incompleted correction items. Per contractor, hardware issues and a revision to the scope of work are all that remain.
|
FIRE-Conference | 5/6/2011 | 5/6/2011 | 5/6/2011 | P | DONE |
Forrest France
|
|
|
Items discussed with contractor include certification tag for the fire extinguisher, repair directional exit sign on alternate power source, provide approved door hardware at the restrooms and the security gate from the pool enclosure, missing stamped plans on site.
|
BLD-Footing | 3/10/2011 | 3/10/2011 | 3/10/2011 | P | PASS |
Tom Arcoraci
|
|
|
footing, stemwall,column and landing inspection for exterior stairs Phone #: ###-#### >> Inspection requested via web by John McCarthy
|
BLD-Wall cover | 2/17/2011 | 2/17/2011 | 2/17/2011 | A | PASS |
Tom Arcoraci
|
|
|
Inspection for second layer of drywall at lower entrance Phone #: ###-#### >> Inspection requested via web by John McCarthy
|
BLD-Wall cover | 2/16/2011 | 2/16/2011 | 2/16/2011 | A | PASS |
Tom Arcoraci
|
|
|
Inspection for first layer of drywall on ceiling in lower entry which will take three layers of drywall. will be ready around 11:00 Phone #: ###-#### >> Inspection requested via web by John McCarthy
|
BLD-Framing/Rough-in | 1/28/2011 | 1/28/2011 | 1/28/2011 | P | PASS |
Tom Arcoraci
|
|
|
interior framing for wall cover and drywall installation Phone #: ###-#### >> Inspection requested via web by John McCarthy
|
BLD-Framing/Rough-in | 1/20/2011 | 1/20/2011 | 1/20/2011 | P | PART |
Jim Sly
|
|
|
nailing inspection for wall sheeting added for the 2'' extension on the existing walls. Phone #: ###-#### >> Inspection requested via web by John McCarthy Talked to John about 2hr rated breezeway......OK to install weather barrier on West wall facing parking lot.
|
FIRE-Conference | 1/7/2011 | 1/7/2011 | 1/10/2011 | P | DONE |
Forrest France
|
|
|
On site conference with contractor regarding fire code review notes and requirements for exit signage/EM lighting.
|
BLD-Framing/Rough-in | 1/6/2011 | 1/6/2011 | 1/6/2011 | P | PART |
Tom Arcoraci
|
|
|
Roof sheeting inspection Phone #: ###-#### >> Inspection requested via web by John McCarthy
|
BLD-Conference | 12/23/2010 | 12/23/2010 | 12/23/2010 | A | PASS |
Tom Arcoraci
|
|
|
inspect nailing pattern for LVL four ply beam Phone #: ###-#### >> Inspection requested via web by John McCarthy
|