FIRE-Final Inspection | 7/14/2011 | 7/14/2011 | 7/14/2011 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 7/14/2011 | 7/14/2011 | 7/14/2011 | P | PASS |
Mike Jordan
|
|
|
Ryan Phone #: ###-####. Ok for perm occ.
|
BLD-Final | 7/12/2011 | 7/13/2011 | 7/13/2011 | P | NR |
Mike Jordan
|
|
|
Ryan Phone #: ###-####
|
FIRE-Final Inspection | 7/12/2011 | 7/13/2011 | 7/13/2011 | A | FAIL |
Troy Cobbley
|
|
|
Plans do not indicate the mechanical/storage basement. Provide verification from the plan reviewer. Remove the dead bolts form the main exit door as required per IFC 1008.1.8.4. Provide indicator at the keyed hardware at the main exit as required per IFC 1008.1.8.3 (2.1). Provide sticker at the main exit as required per IFC 1008.1.8.3 (2.2).
|
BLD-Aging Inspection | 4/21/2011 | 4/21/2011 | 4/21/2011 | | PASS |
Mike Jordan
|
|
|
Work is in progress and almost completed.
|
BLD-Framing/Rough-in | 2/17/2011 | 2/17/2011 | 2/17/2011 | P | PASS |
Mike Jordan
|
|
|
call when on way//Ryan Phone #: ###-####
|
BLD-Energy code compliance | 2/17/2011 | 2/17/2011 | 2/17/2011 | P | PASS |
Mike Jordan
|
|
|
call when on way//Ryan Phone #: ###-####
|
BLD-Framing/Rough-in | 2/14/2011 | 2/14/2011 | 2/14/2011 | P | PART |
Mike Jordan
|
|
|
Ryan Phone #: ###-####. ok to insulate. Work almost completed on install of remaining straps.
|
BLD-Framing/Rough-in | 2/11/2011 | 2/14/2011 | 2/14/2011 | A | PART |
Mike Jordan
|
|
|
Ryan Phone #: ###-####. Needs to provide truss engineering and straps for beams. All pother issues have been resolved. Will recall another framing inspection when ready.
|
BLD-Framing/Rough-in | 2/11/2011 | 2/11/2011 | 2/14/2011 | P | FAIL |
Mike Jordan
|
|
|
late pm please//Ryan Phone #: ###-####. Electrical rough in failed. Needs to complete airseal pack, add additional fasterners at shear walls, noted single top, needs to add galvanized connectors at intersections and wall corners as well as provide additional studs.
|
BLD-Aging Inspection | 2/4/2011 | 2/4/2011 | 2/4/2011 | | PASS |
Mike Jordan
|
|
|
Notexd that work is in progress, framing stage.
|
BLD-Foundation | 11/30/2010 | 12/3/2010 | 12/3/2010 | A | PASS |
Mike Jordan
|
|
|
Nate Phone #: ###-####
|
BLD-Footing | 11/29/2010 | 11/30/2010 | 11/30/2010 | A | PASS |
Mike Jordan
|
|
|
nate - first thing in the morning if possible please Phone #: ###-####
|