BLD-Final | 5/31/2011 | 5/31/2011 | 5/31/2011 | P | PASS |
Dave Hannah
|
|
|
Dave Kelly Phone #: ###-#### ok for perm occ
|
BLD-Final | 5/5/2011 | 5/5/2011 | 5/5/2011 | P | PART |
Dave Hannah
|
|
|
Dave Phone #: ###-#### ok for temp occ ok for perm occ after zoning oks for perm occ
|
BLD-Final | 4/26/2011 | 4/26/2011 | 4/26/2011 | P | NR |
Dave Hannah
|
|
|
Dave Kelly Phone #: ###-####
|
FIRE-Final Inspection | 4/25/2011 | 4/25/2011 | 4/26/2011 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
FIRE-Final Inspection | 4/22/2011 | 4/22/2011 | 4/22/2011 | P | FAIL |
Forrest France
|
|
|
Everything passed life safety except fire panel was not green. Fire panel indicated two trouble conditions.
Remote anunciator was removed and smoke detector was installed at the proper location.
dave Phone #: ###-####
|
BLD-Framing/Rough-in | 4/13/2011 | 4/14/2011 | 4/14/2011 | A | PASS |
Dave Hannah
|
|
|
Dave-Elevator Shaft Phone #: ###-####
|
BLD-Aging Inspection | 4/13/2011 | 4/13/2011 | 4/14/2011 | | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 1/25/2011 | 1/26/2011 | 1/26/2011 | A | PASS |
Jim Storey
|
|
|
dave Phone #: ###-#### engineering straps instaled 2nd floor bearing wal/ a35 and mlb instaled above sheer wall. ok to cover. design copies on site for 425.
|
BLD-Framing/Rough-in | 1/20/2011 | 1/20/2011 | 1/20/2011 | P | PART |
Jim Storey
|
|
|
dave Phone #: ###-#### engineer cut sheet addressed mez. deck/ Fc of mlb spacing exterior/--- need to addresss east roof to bearing wall conection/ top of sheer wall at 1st floor bathroom for atchment and duct penatration. ok to cover 2nd floor and 1st floor east end of shell.
|
FIRE-Conference | 1/5/2011 | 1/5/2011 | 1/5/2011 | P | DONE |
Forrest France
|
|
|
Discussion with contractor regarding emergency lighting requirements.
|