Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD10-02356
StatusFinaled
Name VERTICAL CORP
Site Address 2900 W MAIN ST
Project NameEBERLESTOCK USA
Customer Number 
ePlanReviewNo
Description
(EBERLESTOCK USA) New office/warehouse tenant in 13,150 sq. ft. cold shell building constructed under BLD10-01086. Work to include: [construction of interior non-bearing walls to create four office areas on the second floor, two office areas on the first flor,] installation of separate sex single user restrooms, installation of a new elevator, installation of three stairways, installation of new windows and insulation, installation of new mechanical system, installation of new lighting, and finishes in compliance with chapter 8 of the 2006 IBC. Planning approval done under CUP10-00003 and DRH10-00085. NOTE: This building is fully fire sprinklered. Racking that exceeds 8 ft. in height requires a separate Building Permit be submitted and approved before installation. PLAN MODIFICATION 3-18-2011 – Modification submitted to change submitted elevator (non-rated) shaft to a open metal frame enclosure around elevator.**TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/31/20115/31/20115/31/2011PPASS
DetailsDave Hannah
Dave Kelly Phone #: ###-#### ok for perm occ
BLD-Final5/5/20115/5/20115/5/2011PPART
DetailsDave Hannah
Dave Phone #: ###-#### ok for temp occ ok for perm occ after zoning oks for perm occ
BLD-Final4/26/20114/26/20114/26/2011PNR
DetailsDave Hannah
Dave Kelly Phone #: ###-####
FIRE-Final Inspection4/25/20114/25/20114/26/2011PPASS
DetailsForrest France
Fire life safety finaled.
FIRE-Final Inspection4/22/20114/22/20114/22/2011PFAIL
DetailsForrest France
Everything passed life safety except fire panel was not green. Fire panel indicated two trouble conditions.
Remote anunciator was removed and smoke detector was installed at the proper location.

dave Phone #: ###-####
BLD-Framing/Rough-in4/13/20114/14/20114/14/2011APASS
DetailsDave Hannah
Dave-Elevator Shaft Phone #: ###-####
BLD-Aging Inspection4/13/20114/13/20114/14/2011 PASS
DetailsDave Hannah
BLD-Framing/Rough-in1/25/20111/26/20111/26/2011APASS
DetailsJim Storey
dave Phone #: ###-#### engineering straps instaled 2nd floor bearing wal/ a35 and mlb instaled above sheer wall. ok to cover. design copies on site for 425.
BLD-Framing/Rough-in1/20/20111/20/20111/20/2011PPART
DetailsJim Storey
dave Phone #: ###-#### engineer cut sheet addressed mez. deck/ Fc of mlb spacing exterior/--- need to addresss east roof to bearing wall conection/ top of sheer wall at 1st floor bathroom for atchment and duct penatration. ok to cover 2nd floor and 1st floor east end of shell.
FIRE-Conference1/5/20111/5/20111/5/2011PDONE
DetailsForrest France
Discussion with contractor regarding emergency lighting requirements.