Calvary Chapel New Education Building - To construct a new 15,025 square foot, one story, wood framed and masonry education building and related site improvements. This building is being separated from the existing one story education building, on the south, by a two-hour fire-resistive masonry fire wall. This building is fully fire sprinkled. The sprinklers are used for area increase. This permit also covers the demo and reconstruction of gable roof areas at the east and west sides of the existing preschool building and sanctuary building. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/3/201312/4/201312/4/2013PPASS
DetailsMike Jordan
joe Phone #: ###-####. Ok for perm occ.
BLD-Final9/10/20139/11/20139/11/2013APART
DetailsJim Storey
joe Phone #: ###-#### temp ok pending p&z sign off// mike needs si close out letter.
FIRE-Final Inspection9/9/20139/10/20139/10/2013APASS
DetailsCraig D. Hanson
FIRE-Final Inspection9/5/20139/6/20139/6/2013PFAIL
DetailsTroy Cobbley
Relocate the fire extinguisher to the Storage Room as per the approved plans and provide documentation or resubmittals that show the revised fire dept access on the east side of the building.
BLD-Energy code compliance6/10/20136/11/20136/11/2013APASS
DetailsMike Jordan
joe Phone #: ###-####
BLD-Energy code compliance6/6/20136/7/20136/7/2013APART
DetailsMike Jordan
joe Phone #: ###-####. airseal only ok.
BLD-Framing/Rough-in5/16/20135/17/20135/17/2013PPASS
DetailsTom Arcoraci
call 1/2 hr prior//Paul Smith Phone #: ###-####
BLD-Framing/Rough-in4/3/20134/3/20134/3/2013PPART
DetailsMike Jordan
Shear inspection please-- Phone #: ###-####. Exterior shear nailing ok. Need RFI from engineer of record deleting one MSTC strap from CMU wall to wood wall construction. Approved plan shows 2 mstc straps at each location.
BLD-Final3/29/20134/1/20134/1/2013ACANC
DetailsMike Jordan
paul Phone #: ###-####
BLD-Conference4/1/20134/1/20134/1/2013APASS
DetailsMike Jordan
paul Phone #: ###-####. Received RFI paperwork from engineer of record noting the deletionof the 2nd. tension device and tghat the 21" all thread lenght being acceptable.
BLD-Other3/28/20133/28/20133/28/2013PPART
DetailsMike Jordan
Roof fastening - Paul Phone #: ###-####. Lower roof nailing and diaphragm ok. Need RFI from engineer on HHDQ-S2.5 holdowns. Noted 21 inches of all thread rod before holdown device connection. Simson specs allow for 8" above surface with no reduction as long as bolt elongation has been accounted for. Enginner to review and also review the in place work for only one tension device in each location. Approved plan shows 2 devices in each location.
BLD-Other3/4/20133/5/20133/5/2013PPASS
DetailsMike Jordan
roof sheathing//Joe Phone #: ###-####. Roof sheathing over gym ok. 1 1/8 ply has been substituted in lieu of 3/4 inch ply. Ledger blocking size also increased for proper bearing of roof joist. All lateral bracing on roof joist over gym ok and installed per truss engineering. MPAI130 straps used on roof sheating as well, strap size was aslo increased. Engineer of record to supply RFI for above noted changes.
BLD-Framing/Rough-in2/26/20132/27/20132/27/2013APASS
DetailsJim Storey
joe - roof framing Phone #: ###-#### 450 insp. ok
BLD-Conference2/12/20132/12/20132/12/2013PDONE
DetailsMike Jordan
Stopped at jobsite to review special inspection reports and to talk with contractor about any issues or concerns he may have.
BLD-Final12/27/201212/28/201212/28/2012ADEFR
DetailsTom Arcoraci
joe late morning if possible Phone #: ###-####
BLD-Other12/17/201212/18/201212/18/2012ADEFR
DetailsMike Jordan
joe - grout Phone #: ###-####. Special inspector on site.
BLD-Other12/14/201212/17/201212/17/2012APASS
DetailsMike Jordan
block wall grouting - joe Phone #: ###-####.
BLD-Other12/11/201212/12/201212/12/2012APART
DetailsMike Jordan
joe - block wall grout Phone #: ###-####. south masonry wall, 8ft. to 12ft. elevation pending special inspetions. Contractor also working on detail for approved firestop system at expansion joints on south wall, will either be from metecaulk or hilti.
BLD-Other12/7/201212/11/201212/11/2012APART
DetailsMike Jordan
joe - grout Phone #: ###-####. 4ft. to 8ft. elevation, south wall, pending special inspection. Also noted to contractor to provide UL listing for expansion joint as the south wall is a fire rated wall. Will need access to back side. Also verified all special inspectors certifications.
BLD-Other12/4/201212/5/201212/5/2012APART
DetailsMike Jordan
masonry grout ins//Joe Phone #: ###-####. South wall, 0 to 4ft. elevation. Work in progress went over plans with masonry foreman and job super. Ok for grout placement after special inspector has passed in place work.
BLD-Footing11/6/201211/8/201211/8/2012PPASS
DetailsJim Storey
footing and rebar///Joe Genovese Phone #: ###-#### interior ft rebar ok
BLD-Foundation9/14/20129/17/20129/17/2012ACANC
DetailsMike Jordan
joe Phone #: ###-####
BLD-Energy code compliance9/17/20129/17/20129/17/2012APASS
DetailsMike Jordan
joe Phone #: ###-####. Rigid foam insulation, interior side of stemwall under slab on grade.
BLD-Foundation9/10/20129/13/20129/13/2012ADEFR
DetailsMike Jordan
late am -- Joe Phone #: ###-####
BLD-Foundation9/10/20129/12/20129/12/2012APART
DetailsMike Jordan
late am -- Joe Phone #: ###-####. West stemwall, remainder of east footing. Work is in progress. Will be ok for concrete after special inspection has passed.
BLD-Foundation9/10/20129/11/20129/11/2012APART
DetailsMike Jordan
late am -- Joe Phone #: ###-####. Stem wall, south wall for 2hr. masonry wall. Work is in progress on placing forms. Needs to provide additional verts at masonry corners. Will be ok to place concrete after special inspection has passed.
BLD-Footing9/6/20129/10/20129/10/2012PPART
DetailsMike Jordan
Joe Phone #: ###-####. East footing line, work in progress. Will be ok for concrete after special inspection has passed.
BLD-Footing9/6/20129/7/20129/7/2012PCANC
DetailsMike Jordan
Joe Phone #: ###-####. Stemwall, north footing line.
BLD-Footing9/4/20129/6/20129/6/2012PPART
DetailsMike Jordan
joe Phone #: ###-####. East footing line, work in progress. Will have special inspection. Ok for concreter after special inspector has passed area of work.
BLD-Footing9/5/20129/5/20129/5/2012PPASS
DetailsMike Jordan
Reinforcemen ast south footing line for 2hr. masonry wall. ok. Will have special inspection.
BLD-Footing9/4/20129/5/20129/5/2012ACANC
DetailsMike Jordan
BLD-Footing8/30/20129/4/20129/4/2012PPART
DetailsMike Jordan
Late as possible - Joe Phone #: ###-####. North footing line.
BLD-Footing9/4/20129/5/20129/4/2012PPART
DetailsMike Jordan
joe Phone #: ###-####. North footing. Will have special inspection.