Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD10-02681
StatusFinaled
Name RENAISSANCE REMODELING
Site Address 3302 N WINSOME RD
Project Name 
Customer Number 
ePlanReviewNo
Description
"11-18-2010 THIS PROJECT IS MODIFIED TO REFLECT THE 2ND PHASE OF THE PROJECT THAT WILL INCLUDE THE ADDITION OF 111S.F. TO THE BEDROOM AREA ON THE SOUTH REAR OF THE DWELLING. NO ADDED VALUE AT THIS TIME. pep 11-18-2010" This project is for the razing of an existing 150s.f. covered porch area at the rear of an existing 2080s.f. 1-story single family dwelling. There will be a 280s.f. addition and remodel to this area that will extend the utility room and add a bathroom to the expanded garage and will also include a new 16'-0" overhead door at the side ( north wall of the garage also. R-1B ok per Colleen Carroll. A letter from the applicant’s geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at 384-3946 ESC plan waiver approved due to the excavation being on the up hill side of the lot along with the small amount of excavation. All per the approvd plans as marked energy option 1, engineering details and calculations and the plan review notes. pep
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/2/20115/2/20115/2/2011PPASS
DetailsTony Young
jim Phone #: ###-####
DOC - Permit Finaled5/2/20115/2/20115/2/2011PPASS
DetailsTony Young
c of c issued
BLD-Final4/26/20114/27/20114/27/2011PDEFR
DetailsJim Storey
Jim Phone #: ###-#### need mech sign off
BLD-Final4/26/20114/26/20114/27/2011PNR
DetailsTony Young
Jim Phone #: ###-####,, need trades
BLD-Framing/Rough-in2/2/20112/3/20112/3/2011PPASS
DetailsJim Sly
Jim Phone #: ###-####
BLD-Framing/Rough-in1/11/20111/11/20111/11/2011PFAIL
DetailsMike Jordan
chad Phone #: ###-####Framing at garage aDDITION, bathroom and patio cover. Needs tocomplete airseal, provide approved plans and needs shear nail inspection. Also needs to proveide additional nailing on T7 2 ply truss on webs and bottom chord as per truss engineering and install bearing blocks. ok to insulate.
BLD-Footing11/18/201011/19/201011/19/2010APASS
DetailsMike Jordan
Eric Phone #: ###-####