Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD10-02734
StatusFinaled
Name MIKE HENRY (TEN REP)
Site Address 350 N MILWAUKEE AVE Unit: 1101
Project NameBTS - SPACE 1101 J. Crew
Customer Number 
ePlanReviewNo
Description
(J. CREW - BOISE TOWNE SQUARE MALL - FIRST STORY - SPACE 1101) The fire sprinkler system is required because this is a covered mall building. To combine 2 existing tenant spaces into one 4,750 square foot retail sales tenant space. Work is to include interior nonbearing metal stud walls, FRT wood blocking in some walls, a single user employee restroom accessible to the disabled, a fitting room accessible to the disabled, wood flooring, suspended gypsum board ceilings, suspended acoustical ceilings, a 60 minute fire door in the wall of an existing 1-hr fire-resistance-rated exit passageway, a movable storage shelving system, sales shelving, sales fixtures, millwork, full height glass storefront windows, and wood entrance doors. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. The smoke control system is required to be maintained operational as originally approved. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/17/20113/18/20113/18/2011APASS
DetailsMike Jordan
Late Am pending Fire life saftey---Mike Phone #: ###-####. ok for perm occ.
FIRE-Final Inspection3/17/20113/18/20113/18/2011APASS
DetailsTroy Cobbley
life safety passed
BLD-Other3/9/20113/9/20113/9/2011PPART
DetailsMike Jordan
acoustic ceiling insp//Mike Phone #: ###-####. Provide ceiling wire for diffusers. Will check on file.
BLD-Framing/Rough-in3/8/20113/8/20113/8/2011PNR
DetailsMike Jordan
mike Phone #: ###-####. Electrical rough in inspection failed.
BLD-Framing/Rough-in2/2/20112/3/20112/3/2011APASS
DetailsMike Jordan
All non treated wood was removed and replaced with fire treated wood, All patches are complete.
BLD-Framing/Rough-in2/2/20112/3/20112/2/2011APASS
DetailsMike Jordan
Mike Phone #: ###-####
BLD-Framing/Rough-in1/28/20111/31/20111/31/2011PPART
DetailsMike Jordan
Ceiling & Wall-- MIke Chase Phone #: ###-####. Walls and hardlids only. Needs to remove all non FRP wood and provide FRP wood, repair smioke bulkhead and provide blow patches at existing 1hr. fire partitions. ok to start sheet rocking.