Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD10-02900
StatusFinaled
Name INTERIOR SYSTEMS INC
Site Address 350 N MILWAUKEE ST Unit: 1173
Project NameBTS - #1173 HELZBERG DIAMONDS
Customer Number 
ePlanReviewNo
Description
(HELZBERG DIAMONDS - BOISE TOWNE SQUARE - SPACE 1173 & 1175) To combine two existing spaces and remodel to create one new tenant space. Work to include: [installation of interior non-bearing partition walls to create a employee work area, a sales area, and a unisex restroom], installation of new flooring throughout, construction of a new storefront system, installation of suspended ceiling system per CISCA 0-2, new lighting, new ducts and diffusers, installation of new plumbing, and interior finishes in compliance with ch. 8 of the 2006 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department, The smoke evacuation system shall remain operational as originally installed under the 1985 UBC. (Special inspections on the anchor bolts are required per ICC/ESR - 2202)**TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/17/20113/18/20113/18/2011PPASS
DetailsMike Jordan
Dan Phone #: ###-####. ok for perm. occ.
FIRE-Final Inspection3/17/20113/18/20113/18/2011APASS
DetailsTroy Cobbley
life safety passed
BLD-Other3/10/20113/11/20113/14/2011PPASS
DetailsMike Jordan
Ceiling Inspection---Dan Phone #: ###-####
BLD-Other3/7/20113/8/20113/8/2011ANR
DetailsMike Jordan
Ceiling t-grid inspection please-Dan Phone #: ###-####. Needs other trades rough in inspections first. Dan was contacted and informed.
BLD-Framing/Rough-in2/15/20112/16/20112/16/2011PPART
DetailsMike Jordan
Dan-PLease call at least 30 mins prior to inspection Phone #: ###-####4. Interior steel stud walls, hardlids and soffits. Did note that back soffit (bridal area) is suspended by the 2nd flor joist. Contractor needs to attach soffit to floor deck or provide engineering showjng that floor joist are capable of suporting the additional load.
BLD-Framing/Rough-in2/14/20112/15/20112/15/2011ANR
DetailsMike Jordan
DAN Phone #: ###-####. Needs electrical rough in inspections.