BLD-Final | 4/28/2011 | 4/29/2011 | 4/29/2011 | A | PASS |
Mike Jordan
|
|
|
Cameron Phone #: ###-####. All issues were resolved. Ok for perm. occ.
|
BLD-Final | 4/19/2011 | 4/20/2011 | 4/20/2011 | P | PART |
Mike Jordan
|
|
|
Cameron Phone #: ###-####. ok for temp. occ. Needs to provide vertical grab bars in both restrooms, complete firecaulking in 1hr. roof/ceiling assembly and provide code compliant door hardware on employee enterance.
|
FIRE-Final Inspection | 4/19/2011 | 4/20/2011 | 4/20/2011 | A | PASS |
Troy Cobbley
|
|
|
life safety passed. Per conversation with the building inspector the west facing exit doors that require the single action hardware will be verified by the building inspector.
|
FIRE-Final Inspection | 4/15/2011 | 4/19/2011 | 4/19/2011 | P | FAIL |
Troy Cobbley
|
|
|
See the correction notice for items completed as the job site. Not all of the items have been addressed.
|
FIRE-Final Inspection | 4/11/2011 | 4/12/2011 | 4/12/2011 | A | FAIL |
Troy Cobbley
|
|
|
Provide for final inspection for BLD11-00265. Provide for testing of the exit discharge lights and exit signs. Repair emergency light in "check out" area. Provide single action hardware for the west exterior exit doors (per the plans one door panel is to be fixed). The "Cylinder Closet" exterior wall venting does not meet the height requirements of IFC 3006.2.1. Provide the NFPA Hazard Warning Sign per IFC 2703.5. Door is missing the smoke seal.
|
BLD-Energy code compliance | 3/15/2011 | 3/16/2011 | 3/16/2011 | P | PASS |
Tom Arcoraci
|
|
|
Cameron Phone #: ###-#### grid ok, 1 hr can lights covers ok
|
BLD-Other | 2/23/2011 | 2/24/2011 | 2/24/2011 | A | PASS |
Mike Jordan
|
|
|
drywall nail inspection 2nd layer//cameron Phone #: ###-####. face layer of 5/8 type x rock for 1hr. ceiling and 1hr. firewall.
|
BLD-Other | 2/23/2011 | 2/23/2011 | 2/23/2011 | P | PART |
Mike Jordan
|
|
|
drywall nail inspection 1st layer//Cameron Phone #: ###-####. Base layer of 5/8 type x rock for 1hr. ceiling assembly.
|
BLD-Framing/Rough-in | 2/18/2011 | 2/22/2011 | 2/22/2011 | A | PASS |
Mike Jordan
|
|
|
Cameron Phone #: ###-####. All framing issues have been resolved. Also met with sheetrock contractor. All other fire issues with 1hr. ceiling have been discussed and will be inspected as job progresses.
|
BLD-Energy code compliance | 2/22/2011 | 2/22/2011 | 2/22/2011 | A | PASS |
Mike Jordan
|
|
|
Cameron Phone #: ###-####
|
BLD-Energy code compliance | 2/16/2011 | 2/18/2011 | 2/18/2011 | P | CANC |
Mike Jordan
|
|
|
cameron Phone #: ###-####
|
BLD-Framing/Rough-in | 2/16/2011 | 2/17/2011 | 2/17/2011 | P | FAIL |
Mike Jordan
|
|
|
cameron Phone #: ###-####. Sprinkler rough in required prior to cover, Bearing blocks required at girder truss T15 and T14. Truss T7 requires min 2x6 T bracing, 2x4 was used. Need approved plan forshell portion of work. Needs to provide rated can lights or box out. Provide damperas for ducts, fire collar for water heater vent, 5/8 type x rock reqiured at ceiling at pre built soffits. ok to inulate.
|
BLD-Energy code compliance | 2/4/2011 | 2/4/2011 | 2/4/2011 | P | PART |
Mike Jordan
|
|
|
CAMERON Phone #: ###-####. Wall insulation at 1hr. gas room.
|
BLD-Conference | 1/27/2011 | 2/1/2011 | 2/1/2011 | A | CANC |
Mike Jordan
|
|
|
cameron Phone #: ###-#### 1-31-11 PER CAMERON JAYO CONSTRUCTION CANCEL INSPECTION ///DLD
|
BLD-Footing | 1/26/2011 | 1/27/2011 | 1/27/2011 | P | PASS |
Mike Jordan
|
|
|
cameron Phone #: ###-####. Footing for 1hr gas room.
|