Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD10-02928
StatusFinaled
Name SHY-BEE DESIGN
Site Address 3590 E PARKCENTER
Project NameHARRIS RANCH IRRIGATION BARN
Customer Number 
ePlanReviewNo
Description
(HARRIS RANCH IRRIGATION BARN) ***4-5-12 PLAN MODIFICATION TO INCLUDE: REVISE THE LOCATION OF THE RESTROOM AND JANITOR ROOM; REMOVE A PAIR OF DOORS; AND ADD A FLOOR DRAIN PER THE APPROVED PLANS. SRZ*** To construct a new 1,567 square foot, One story, wood framed, irrigation barn. This structure will have a pump room for the irrigation pump, a maintenance room, janitors closet, and a fully accessible Unisex restroom. The construction of Future work noted on the plans for the kitchenette, storage, new dual height (hi-lo) accessible drinking fountain, and 2nd restroom is not part of this permit and will require separate permits. Work to include: Construct the building per plans; install a service sink; HVAC/mechanical work, electrical work, and plumbing work per plans; and interior finish work in compliance with chapter 8 of the 2006 IBC. This building is NOT fire sprinklered. All work per the approved plans, attached plan review comments, and conditions of all reviewing agencies for this project. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection3/13/20133/13/20133/13/2013 PASS
DetailsDave Hannah
DOC - Permit Finaled3/13/20133/13/20133/13/2013APASS
DetailsDave Hannah
BLD-Final6/25/20126/26/20126/26/2012APASS
DetailsDave Hannah
TIM Phone #: ###-####
FIRE-Final Inspection6/21/20126/22/20126/22/2012APASS
DetailsForrest France
C/N items finished. Life safety passed.
FIRE-Final Inspection6/20/20126/20/20126/20/2012PFAIL
DetailsForrest France
Door hardware and signage need revised as discussed.
BLD-Final6/19/20126/19/20126/19/2012PNR
DetailsJim Sly
jim Phone #: ###-####
Called Tim Need finals from P/.W ACHD Zoning Fire.......Etc.
BLD-Framing/Rough-in5/7/20125/8/20125/8/2012PPART
DetailsDave Hannah
tim Phone #: ###-#### ok to cover restroom and office
BLD-Wall Bracing4/18/20124/19/20124/19/2012APASS
DetailsDave Hannah
Shear inspection - - TIm Phone #: ###-####
BLD-Wall Bracing4/16/20124/16/20124/16/2012PFAIL
DetailsDave Hannah
TIM Phone #: ###-#### plans call out nails crew used staples also need same thing from engineer on location of panels wording on plans sounds like the hole bldg is sheared ?
BLD-Foundation3/27/20123/28/20123/28/2012APASS
DetailsDave Hannah
Ian Phone #: ###-####
BLD-Footing3/27/20123/27/20123/27/2012PPASS
DetailsDave Hannah
BLD-Foundation3/26/20123/27/20123/27/2012ACANC
DetailsDave Hannah
Phone #: 8604101 >> Inspection requested via mobile web by dane
BLD-Foundation3/20/20123/22/20123/22/2012PCANC
DetailsDave Hannah
Ian Phone #: ###-####
BLD-Footing3/20/20123/21/20123/21/2012PCANC
DetailsDave Hannah
Ian Phone #: ###-####