Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD10-02939
StatusFinaled
Name SYNERGY BUILDING COMPANY INC
Site Address 3041 W PASADENA DR
Project NameMWI Veterinary Supply
Customer Number 
ePlanReviewNo
Description
(MWI VETERINARY SUPPLY - ENTIRE BUILDING) Fire sprinklers used to substitute for the 1-hr fire-resistance-rating of the building. To remodel an existing building (basement, 1st story, 2nd story, and 3rd story) for a new office tenant. Each story has a floor area of about 15,000 square feet. Work is to include interior nonbearing walls, new or relocated doors, millwork, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. The fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/16/20116/17/20116/17/2011APASS
DetailsJim Storey
Martin Phone #: ###-#### final ok perm occ. not able to sign card.
BLD-Final4/5/20114/6/20114/6/2011APART
DetailsJim Storey
martin Phone #: ###-#### temp ok
FIRE-Final Inspection4/4/20114/5/20114/5/2011APASS
DetailsForrest France
Corrections finished. Fire life safety passed.
FIRE-Final Inspection3/31/20114/1/20114/1/2011PPART
DetailsForrest France
Correction items verified for completion. Final pending repair of an exit sign and one non-functional damper motor at the 3rd floor.
FIRE-Final Inspection3/31/20113/31/20113/31/2011PPART
DetailsForrest France
Corrections underway.
FIRE-Final Inspection3/29/20113/30/20113/30/2011PNR
DetailsForrest France
Preliminary life safety inspection completed including UPS and emergency generator tests, noted areas on each floor in need of adjustments in exit signage placement and EM lighting, noted hardware at two doors to be switched, discussed fire extinguishers, building address, occupant load signs, review notes, project schedule, fire alarm work, etc.
BLD-Framing/Rough-in3/15/20113/16/20113/16/2011PPASS
DetailsJim Storey
martin - ceiling grid Phone #: ###-####
BLD-Other3/14/20113/15/20113/15/2011AFAIL
DetailsJim Storey
Ceiling grid basement--Martin Phone #: ###-#### seal coridor penatrations.
BLD-Other3/8/20113/8/20113/8/2011PPART
DetailsJim Sly
martin (this is for the first floor) Phone #: ###-####
Ceiling Grid 1st floor OK ...Except for Corridors.
FIRE-Conference2/24/20112/24/20112/24/2011PDONE
DetailsForrest France
Regarding project related fire alarm work.
BLD-Other2/18/20112/22/20112/22/2011APASS
DetailsJim Storey
ceiling grid insp for 3rd floor//Martin Phone #: ###-#### all ceillings ok pending others.
BLD-Framing/Rough-in1/20/20111/21/20111/21/2011PPASS
DetailsJim Storey
martin Phone #: ###-#### first floor ok to cover.
BLD-Framing/Rough-in1/14/20111/18/20111/18/2011PPASS
DetailsJim Storey
Martin ###-####