BLD-Final | 8/18/2011 | 8/18/2011 | 8/18/2011 | P | PASS |
Mike Jordan
|
|
|
tom - ###-####. Ok for perm. occ.
|
BLD-Final | 8/16/2011 | 8/18/2011 | 8/17/2011 | P | NR |
Mike Jordan
|
|
|
tom Phone #: ###-####
|
FIRE-Final Inspection | 8/16/2011 | 8/17/2011 | 8/17/2011 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 8/12/2011 | 8/15/2011 | 8/15/2011 | P | FAIL |
Troy Cobbley
|
|
|
The life safety will be ready to sign off when the project related fire alarm and fire sprinkler permits are finaled and approved single action hardware is provided on the fire riser door.
|
BLD-Other | 7/20/2011 | 7/21/2011 | 7/21/2011 | P | PASS |
Tom Arcoraci
|
|
|
Above ceiling for cover--Tom Phone #: ###-####
|
BLD-Other | 7/20/2011 | 7/20/2011 | 7/20/2011 | P | NR |
Mike Jordan
|
|
|
ceiling grid insp//Tom Phone #: ###-####. Needs mech. rough in inspection.
|
BLD-Framing/Rough-in | 6/17/2011 | 6/17/2011 | 6/17/2011 | P | PASS |
Mike Jordan
|
|
|
tom Phone #: ###-####. Interior steel stud framed walls at foier.
|
BLD-Energy code compliance | 6/6/2011 | 6/7/2011 | 6/7/2011 | P | PASS |
Mike Jordan
|
|
|
Tom Phone #: ###-####
|
BLD-Framing/Rough-in | 6/2/2011 | 6/3/2011 | 6/3/2011 | P | PASS |
Mike Jordan
|
|
|
Tom Phone #: ###-####. Interior steel stud walls and exterior wood framed walls only.
|
BLD-Framing/Rough-in | 5/17/2011 | 5/17/2011 | 5/17/2011 | P | PART |
Mike Jordan
|
|
|
Verified fireblocking at all pop outs. ok to cover.
|
FIRE-Conference | 5/13/2011 | 5/16/2011 | 5/16/2011 | A | DONE |
Troy Cobbley
|
|
|
Per discussion the "concealed combustible" chases on the exterior of the building are not required to have sprinkler protection and can be covered with no further modifications.
|
BLD-Framing/Rough-in | 5/12/2011 | 5/13/2011 | 5/13/2011 | P | PART |
Mike Jordan
|
|
|
Tom Phone #: ###-####Exterior shear nailing only. Needs to provide coil straps at east and north side of building, provide fire blocking at 10ft. intervals at pop outs.
|
BLD-Framing/Rough-in | 5/9/2011 | 5/10/2011 | 5/10/2011 | A | PART |
Mike Jordan
|
|
|
tom Phone #: ###-####. Visually inspected the attachment and all associated hardware of the roof diaphragm system. All work was done in accordance with approved plans.
|
FIRE-Conference | 5/5/2011 | 5/6/2011 | 5/6/2011 | A | DONE |
Troy Cobbley
|
|
|
Tom and I went over fire dept access requirements for the site.
|
BLD-Foundation | 4/13/2011 | 4/14/2011 | 4/14/2011 | A | PASS |
Jim Sly
|
|
|
tom Phone #: ###-#### OK pending MTI special inspection, tests and approvals.....Also looked at trash enclosure footing.....appears OK.
|
BLD-Footing | 4/11/2011 | 4/12/2011 | 4/12/2011 | P | PASS |
Mike Jordan
|
|
|
Tom Phone #: ###-####. Perimeter footing.
|