Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD10-02988
StatusVoid/No Violation
Name RADIX CONSTRUCTION INC
Site Address 611 N STEELHEAD WAY
Project NameTENANT SHELL-SW CORNER
Customer Number 
ePlanReviewNo
Description
("TENANT SHELL" - SOUTHWEST CORNER) Fire sprinklers used for building area increase. To create a 6,810 square foot office tenant space within an existing 33,000 square foot, 1 story building. Work is to include 2 restrooms accessible to the disabled, interior nonbearing walls, gypsum board ceilings, and an entry vestibule. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. This permit is a “tenant shell” permit only. It does not establish a Certificate of Occupancy for any tenant. A separate tenant improvement permit is required to establish occupancy. A tenant improvement permit (BLD10-02989) for the adjacent tenant space (Trinity Health) is included on the same drawings. An interior nonstructural demolition permit (BLD10-02923) and a partial permit (BLD10-02987) have also been issued. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Conference9/18/201210/2/201210/2/2012ADONE
DetailsTroy Cobbley
Permit is voided
FIRE-Conference9/12/20129/13/20129/18/2012ADONE
DetailsTroy Cobbley
I left message for Jim at Radix requesting job status as per the job history that I can access and the need to get the project finaled.
BLD-Conference3/22/20113/22/20113/22/2011PDONE
DetailsMike Jordan
john Phone #: ###-####. Went over exterior floor elevation issues at new exit door.
BLD-Framing/Rough-in2/4/20112/7/20112/7/2011PPASS
DetailsMike Jordan
John Phone #: ###-####. Interior steel stud walls for demissing wall only. Also noted that contractor has indicated that the owner wants to hold off on construction od restrooms at this time, Waste and vent are being installed at this time. Noted to contgractor to get scope of work modified.