Permit Information
Permit NumberBLD10-02989
StatusFinaled
Name AVEST LIMITED PARTNERSHIP
Site Address 8757 W EMERALD
Project NameTRINITY HEALTH
Customer Number 
ePlanReviewNo
Description
(TRINITY HEALTH) (3-7-11 Plan Modification to include a furniture plan and to show electrical, lighting, and plumbing changes). The fire sprinkler system is used for building area increase. To create a 24,796 square foot office tenant space within an existing 33,000 square foot, 1 story building. Work is to include interior nonbearing walls, modified suspended ceilings, interior doors with sidelights, interior doors, and finishes. In addition, a new 5 foot opening will be created in an existing interior wood shear wall. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. A "vanilla finish" permit (BLD10-02988) for the adjacent tenant space is included on the same drawings. An interior nonstructural demolition permit (BLD10-02923) and a partial permit (BLD10-02987) have also been issued. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/9/20115/10/20115/9/2011APASS
DetailsMike Jordan
john Phone #: ###-####. ok for perm. occ.
BLD-Final4/4/20114/5/20114/5/2011APART
DetailsMike Jordan
john Phone #: ###-####. Temp occ. granted. Will be ok for perm occ. once electrical signs off perm.
FIRE-Final Inspection4/4/20114/5/20114/5/2011APASS
DetailsTroy Cobbley
life safety passed.
FIRE-Final Inspection4/4/20114/4/20114/4/2011PCANC
DetailsTroy Cobbley
duplicate inspection.
FIRE-Final Inspection4/4/20114/4/20114/4/2011PFAIL
DetailsTroy Cobbley
Repair the inoperative exit sign in the break room and repair the inoperative lense in the emergency light in the south vestible.
FIRE-Final Inspection3/31/20114/1/20114/1/2011AFAIL
DetailsTroy Cobbley
The arrrows on the exit signs need to be "punched out", exit signs relocated and additional exit signs installed as per the city approved plans. The push to exit buttons need to be provided at the two west exterior exit doors.
BLD-Final3/31/20114/1/20114/1/2011PNR
DetailsTom Arcoraci
late pm please//John Phone #: ###-####
BLD-Framing/Rough-in3/8/20113/8/20113/8/2011PPART
DetailsMike Jordan
john Phone #: ###-####. Ceiling grid at new offices only. Remainder of grid is existing.
FIRE-Conference3/3/20113/3/20113/3/2011ADONE
DetailsTroy Cobbley
I spoke to the job super intendant about that it appears that there will be significant changes in the sprinkler plans that will require resubmittals/plan modifications.
BLD-Framing/Rough-in2/23/20112/23/20112/23/2011PPASS
DetailsMike Jordan
additional structural support//Jon Phone #: ###-####. Visually inspected the structural upgrade work to the roof joist for additional rtu unit. All work was done per RFI from structural engineer of record.
BLD-Framing/Rough-in2/11/20112/11/20112/11/2011PPART
DetailsMike Jordan
jon Phone #: ###-####. Interior steel stud framing for a managers office that was moved. Needs to sumbit plan modification showing the new office location as well as the vestibule on vanilla finsh side. Contractors was notified.
BLD-Framing/Rough-in2/4/20112/7/20112/7/2011PPASS
DetailsMike Jordan
John Phone #: ###-####. Interior steel stud walls only.