Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD11-00079
StatusFinaled
Name IND SCHOOL DIST OF BOISE CITY
Site Address 6411 W FAIRFIELD AVE
Project NameGrace Jordan Elementary
Customer Number 
ePlanReviewNo
Description
Grace Jordan Elementary School - Classroom Addition - To construct a 5,623 square foot, one story classroom and restroom addition at the west end of an existing 59,007 square foot elementary school. The addition is constructed of masonry exterior walls with wood framed roof trusses and metal interior stud walls, to match existing school construction. One portion of the addition consists of a 3,298 square foot addition on the northwest wing of the building which will have two new classrooms and two new accessible restrooms. The other portion of the addition consists 2,325 square foot addition at the southwest wing of the school which will have two new classrooms. This permit also includes related site improvements. On May 5, 2011, this permit was modified to include the conversion of an existing approximate 610 sq. ft., Title One Classroom into two new multi-user accessible restrooms and an access hallway. The restroom fixtures and hardware mounting heights are designed to comply with children's accessible restroom requirements. The original school building was completed in 2009 under building permit BLD07-00143. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference10/17/201111/17/201111/17/2011APASS
DetailsTom Arcoraci
temp expires
BLD-Aging Inspection10/17/201110/17/201110/17/2011 PASS
DetailsTom Arcoraci
BLD-Final8/17/20118/17/20118/17/2011PPASS
DetailsTom Arcoraci
Tom, give me a call and I will meet you onsite. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Final7/29/20118/1/20118/1/2011PPART
DetailsTom Arcoraci
Phone #: ###-#### >> Inspection requested via web by Gary Simon ok for temp needs grab bars in bathrooms
FIRE-Final Inspection7/29/20118/1/20118/1/2011APASS
DetailsTroy Cobbley
Life safety passed
BLD-Conference7/29/20117/29/20117/29/2011PNR
DetailsTom Arcoraci
Tom, I need to talk with you about the final. Could you please com by early afternoon. Phone #: ###-#### >> Inspection requested via web by Gary Simon
FIRE-Final Inspection7/28/20117/29/20117/29/2011PFAIL
DetailsTroy Cobbley
Need the missing exit discharge light bulb installed, the fire alarm and fire sprinkler pemits to be finaled.
BLD-Conference7/21/20117/22/20117/22/2011APASS
DetailsTom Arcoraci
Late am if possible. Ceiling inspection. The electrical inspector is coming by in the am and is going to allow us to get the borders installed. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Framing/Rough-in7/6/20117/7/20117/7/2011APASS
DetailsTom Arcoraci
Restroom framing. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Energy code compliance6/22/20116/22/20116/22/2011PPASS
DetailsTom Arcoraci
Tom, I should have something for you by mid-afternoon. Wall insulation and vapor barrier. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Energy code compliance6/21/20116/22/20116/22/2011ACANC
DetailsTom Arcoraci
Looking at the insulation and vapor barrier in both wings. Late morning would be great. Phone #: ###-#### >> Inspection requested via web by Gary Simon Inspection cancelled from web by: Gary Simon
BLD-Framing/Rough-in6/21/20116/21/20116/21/2011PPASS
DetailsTom Arcoraci
Rough in walls and underside of roof deck. Both wings. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Other6/10/20116/10/20116/10/2011PPASS
DetailsTom Arcoraci
Roof nailing inspection. Both wings Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Final6/1/20116/1/20116/1/2011PDEFR
DetailsMike Jordan
Grouting gridline 1 south wing (topped out) and the 10'' walls on gridlines F & G south wing. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Other5/27/20115/27/20115/27/2011ADEFR
DetailsMike Jordan
Grouting cmu on North and South wings. 9:00am Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Other5/24/20115/25/20115/25/2011PPASS
DetailsTom Arcoraci
Grout cmu @ 8'' on the S wing and 10'' on the interior walls of the N wing. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Other5/20/20115/20/20115/20/2011PPART
DetailsJim Storey
CMU inspection please-Grout around 2:00--Gary Phone #: ###-#### placed w/si
BLD-Concrete5/4/20115/4/20115/5/2011PPART
DetailsTom Arcoraci
per Gary Simon this inspection is for the class room addition only (not the restroom) please call Gary ###-#### please verify brfore inspection.
BLD-Foundation4/25/20114/26/20114/26/2011APART
DetailsTom Arcoraci
South wing foundation walls. Should be ready by 11:00am. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Foundation4/21/20114/22/20114/22/2011APART
DetailsTom Arcoraci
North wing foundation. South wing partial ftgs. Phone #: ###-#### >> Inspection requested via web by Gary Simon spec inspection
BLD-Footing4/18/20114/18/20114/18/2011PPASS
DetailsTom Arcoraci
Looking at the rebar in the ftgs. on both wings. Phone #: ###-#### >> Inspection requested via web by Gary Simon