Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD11-00125
StatusFinaled
Name ASIN HOMES
Site Address 513 E MAIN ST
Project NamePengillys Saloon
Customer Number 
ePlanReviewNo
Description
(PENGILLY'S SALOON)(EXPANSION WITHIN EXISTING BUILDING TO INCLUDE 1ST AND 2ND FLOORS AND BASEMENT FOR ONE TENANT) Remodel of an existing 1,678 sq. ft. bar, expanding into the adjacent 1,312 sq. ft. space per approved plans. New total area of the tenant space will be 2,990 sq. ft. on first floor; combining of 1,047 sq. ft. portion of 2nd floor with 1,942 sq. ft. area above Pengilly's for 2,989 sq. ft. office area. Combining the two former basement areas totaling 2,880 sq. ft. Stair to crawl space area originally serving Old Boise Guitar side is being removed and new opening for access between two crawl space areas is being installed. New expansion space of 1st, second & basement were formerly occupied by "Old Boise Guitar". Work to include select interior demolition, new structural beam, posts and connectors at new wall openings; new fully accessible restrooms on 1st floor; new stairway between 1st & 2nd floor; modifications of exterior landings and accessible ramp at alley side parking lot with sign at main street entrance directing patrons to the accessible route location; upgrade stairs, handrails & guards per code; safety glass, doors and hardware per code, exit signage and emergency lighting. NOTE: This building will be fully fire sprinklered with alarm in conjunction with this permit. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/14/201110/17/201110/17/2011PPASS
DetailsDave Hannah
All other inspections have been done. Scott Phone #: ###-#### >> Inspection requested via web by Scott Asin
FIRE-Final Inspection10/13/201110/14/201110/14/2011PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Conference10/5/201110/6/201110/6/2011PNR
DetailsJim Sly
I am ready for the fire/life safety inspection. I have the approved plans and sign-off card onsite by the back set of stairs. Phone #: ###-#### >> Inspection requested via web by Scott Asin
FIRE-Final Inspection10/6/201110/6/201110/6/2011AFAIL
DetailsForrest France
Noted missing exit signs and EM lighting per plan at the 2nd, 1st and basement levels- see A and E sheets on stamped plan set for locations, remove cover at the FACP smoke detector, repair one non-functional light at an EM adjacent to the restrooms, remove non-required signage at 2nd floor door 29, door 8e appears to need hardware group 4, provide approved hardware at the bar door to basement stairs.
FIRE-Final Inspection10/6/201110/6/201110/6/2011AFAIL
DetailsForrest France
See plan annotations.
FIRE-Final Inspection10/5/201110/6/201110/5/2011ACANC
DetailsForrest France
I am ready for the fire/life safety inspection. Phone #: ###-#### >> Inspection requested via web by Scott Asin Inspection cancelled from web by: Scott Asin
BLD-Framing/Rough-in9/7/20119/8/20119/8/2011APASS
DetailsDave Hannah
scott please look at celing and the old bathroom and office area Phone #: ###-####
BLD-Framing/Rough-in9/7/20119/7/20119/7/2011PPART
DetailsDave Hannah
scott please look at celing and the old bathroom and office area Phone #: ###-#### needs to fire block furred out wall and add metal stapes to ceiling
FIRE-Conference8/31/20118/31/20118/31/2011PDONE
DetailsForrest France
Regarding project schedule and related FIR trade permit work.
FIRE-Conference8/15/20118/16/20118/16/2011ADONE
DetailsForrest France
We are getting ready to open the wall between the two halves of the building. I would like to have you take a look around to see if we missed anything. Once the new bathrooms are being used, we will go in and remove the old bathrooms, office and stage. This is kind of a partial final inspection I guess. Thanks. Scott Phone #: ###-#### >> Inspection requested via web by Scott Asin
BLD-Conference8/15/20118/15/20118/16/2011PPART
DetailsDave Hannah
We are ready to start using the new bathrooms and opening up the temp wall between the two halves of the building. I would like to check with you to see if you are okay with that. Phone #: ###-#### >> Inspection requested via web by Scott Asinok to use back area after other trades ok
BLD-Framing/Rough-in6/20/20116/21/20116/21/2011APASS
DetailsDave Hannah
HVAC, Electrical and Plumbing are all inspected. Phone #: ###-#### >> Inspection requested via web by Scott Asin