Information based on query as of Thursday, September 26, 2024.
Permit Information
Permit NumberBLD11-00136
StatusFinaled
Name COMAN HOMES OF IDAHO INC
Site Address 548 E CLUBVIEW DR
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 3,745 sq. ft., two story (first story 2,457 sq. ft., second story 1,288 sq. ft.) single family dwelling with 4 bedrooms, 3 1/2 bathrooms, approximately 730 sq. ft. of covered patio/porch and a 1,152 sq. ft. attached garage per the approved plans, plan review report and any notations. This structure is located in WUI zone A requiring noncombustible siding, class A roofing material and one hour soffits. A letter from the applicant’s geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at 384-3946. The galss gaurd and handrail system has not been approved as part of this permit and a deferred submittal is being allowed with the designer to provide the required engineering to the building department for review prior to installation. A-1 zoning and setbacks per planning. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/15/201112/15/201112/15/2011PPASS
DetailsTony Young
greg Phone #: ###-####,, status ck,, final ok now
DOC - Permit Finaled12/15/201112/15/201112/15/2011PPASS
DetailsTony Young
c of o issued
DOC - Permit Finaled12/15/201112/15/201112/15/2011PPASS
DetailsTony Young
c of o issued
BLD-Conference12/14/201112/15/201112/15/2011APASS
DetailsTony Young
greg Phone #: ###-####,, status ck,,, calcs given to plan review,, scaned into documents,,, ok per plan review
BLD-Final12/9/201112/12/201112/14/2011ANR
DetailsTony Young
greg Phone #: ###-####,, need glass guardrail engineering
BLD-Conference12/13/201112/14/201112/14/2011APEND
DetailsTony Young
greg Phone #: ###-####,, status ck,,, still working on calcs,,, should have by thursday the 15th,, per Greg
BLD-Final12/8/201112/9/201112/12/2011PFAIL
DetailsTony Young
greg Phone #: ###-####,, need engineering
BLD-Final12/8/201112/8/201112/9/2011PPART
DetailsTony Young
greg Phone #: ###-####,, all ok except need the engineer approval on the glass guardrail
BLD-Final12/6/201112/6/201112/7/2011PFAIL
DetailsTony Young
greg Phone #: ###-####,, correction posted,, need glass guardrail approval from plan review,, address visible from road,, tempered glass etc,,
BLD-Grading Inspection11/29/201111/29/201111/29/2011ADONE
DetailsTerry Records
Final grading and drainage approved
BLD-Energy code compliance6/8/20116/9/20116/9/2011APASS
DetailsTony Young
Greg Phone #: ###-####
BLD-Framing/Rough-in6/2/20116/2/20116/2/2011PPASS
DetailsJim Storey
Greg Phone #: ###-####
BLD-Framing/Rough-in4/11/20114/12/20114/12/2011APART
DetailsTony Young
greg Phone #: ###-####,, ext. shear ok
BLD-Foundation3/8/20113/9/20113/10/2011APART
DetailsTony Young
cal Phone #: ###-####
BLD-Foundation3/8/20113/8/20113/10/2011PPART
DetailsTony Young
cal Phone #: ###-####
BLD-Foundation3/4/20113/7/20113/9/2011PPART
DetailsTony Young
Cal Phone #: ###-####
BLD-Foundation3/3/20113/4/20113/4/2011ANR
DetailsTony Young
CAL Phone #: ###-####
BLD-Footing3/2/20113/3/20113/3/2011APASS
DetailsTony Young
CAL Phone #: ###-####