BLD-Conference | 1/13/2012 | 1/30/2012 | 1/30/2012 | A | PASS |
Jim Sly
|
|
|
Talked to Tim Woodard...Permit issued.
|
DOC - Permit Finaled | 1/30/2012 | 1/30/2012 | 1/30/2012 | P | PASS |
Jim Sly
|
|
|
|
BLD-Conference | 1/13/2012 | 1/13/2012 | 1/13/2012 | A | DONE |
Jim Sly
|
|
|
Taked to Patrick. Working with Oscar (architect) from LRK and Tim woodard. Has turned in plan.
|
BLD-Conference | 1/3/2012 | 1/12/2012 | 1/13/2012 | A | CANC |
Jim Sly
|
|
|
Patrick phone
|
BLD-Conference | 12/27/2011 | 1/3/2012 | 1/3/2012 | A | NH |
Jim Sly
|
|
|
Patrick phone Re-sched........
|
BLD-Conference | 12/16/2011 | 12/22/2011 | 12/27/2011 | A | CANC |
Jim Sly
|
|
|
Patrick phone
|
BLD-Conference | 12/16/2011 | 12/22/2011 | 12/27/2011 | A | CANC |
Jim Sly
|
|
|
Patrick phone
|
BLD-Conference | 12/11/2011 | 12/16/2011 | 12/16/2011 | A | DONE |
Jim Sly
|
|
|
Patrick phone Talked to Patrick.....Should be turning in paperwork by Dec 22.
|
BLD-Conference | 12/5/2011 | 12/9/2011 | 12/11/2011 | P | DONE |
Jim Sly
|
|
|
Patrick phone Went to office.....Patrick not there. Called him....left V/M No return call.
|
BLD-Conference | 12/2/2011 | 12/5/2011 | 12/5/2011 | A | NH |
Jim Sly
|
|
|
Patrick Check back.....
|
BLD-Conference | 11/25/2011 | 12/2/2011 | 12/2/2011 | P | NH |
Jim Sly
|
|
|
No one in office.
|
BLD-Conference | 11/30/2011 | 12/2/2011 | 12/2/2011 | A | NH |
Jim Sly
|
|
|
NH
|
BLD-Conference | 11/25/2011 | 11/30/2011 | 11/30/2011 | A | CANC |
Mike Jordan
|
|
|
Patrick phone.
|
BLD-Conference | 11/23/2011 | 11/25/2011 | 11/25/2011 | P | NH |
Jim Sly
|
|
|
Patrick phone ###-#### No one at office....no return phone call.
|
BLD-Conference | 11/9/2011 | 11/24/2011 | 11/23/2011 | P | CANC |
Jim Sly
|
|
|
Patrick phone
|
BLD-Conference | 11/7/2011 | 11/9/2011 | 11/9/2011 | P | PEND |
Jim Sly
|
|
|
Patrick phone.............Patrick called and said Architect was meeting him today to draw out floor plan to submit to the city.
|
BLD-Conference | 11/2/2011 | 11/4/2011 | 11/7/2011 | P | PEND |
Jim Sly
|
|
|
Patrick phone..........Stopped at jobsite....Patrick not avaliable....had secretary leave a note for Patrick...to call me.
|
BLD-Conference | 10/31/2011 | 11/2/2011 | 11/2/2011 | A | CANC |
Jim Sly
|
|
|
Patrick phone.....
|
BLD-Conference | 10/30/2011 | 11/1/2011 | 10/31/2011 | A | CANC |
Jim Sly
|
|
|
Patrick phone....Re-sched for Wed.
|
BLD-Conference | 10/25/2011 | 10/31/2011 | 10/30/2011 | A | CANC |
Jim Sly
|
|
|
Patrick phone Re-sched for Tues ....
|
BLD-Conference | 10/11/2011 | 10/25/2011 | 10/25/2011 | P | CANC |
Jim Sly
|
|
|
Patrick phone Re-sched.....
|
BLD-Conference | 10/5/2011 | 10/11/2011 | 10/11/2011 | P | PEND |
Jim Sly
|
|
|
Patrick WIP
|
BLD-Conference | 10/3/2011 | 10/5/2011 | 10/5/2011 | P | PEND |
Jim Sly
|
|
|
Patrick or Dawn see prev for #s Talked with Patrick Architects are working on plan for submittal.
|
BLD-Conference | 9/8/2011 | 10/3/2011 | 10/3/2011 | P | PEND |
Jim Sly
|
|
|
Check back ....status? Left Corr notice ....call back with status of previous corrections.
|
BLD-Final | 9/8/2011 | 9/9/2011 | 9/9/2011 | A | CANC |
Jim Sly
|
|
|
Patirick Phone #: ###-####
|
BLD-Conference | 8/29/2011 | 9/8/2011 | 9/8/2011 | P | NR |
Jim Sly
|
|
|
Talked to Patrick.....Need to re-submit floor plan for approval. Need fire final OK Patrick has met with Tim Woodard.
|
FIRE-Final Inspection | 9/8/2011 | 9/8/2011 | 9/8/2011 | P | FAIL |
Troy Cobbley
|
|
|
All items have been corrected except for the revised floor plan.
|
BLD-Conference | 8/26/2011 | 8/29/2011 | 8/29/2011 | A | DONE |
Jim Sly
|
|
|
Please check on this-do we need to expire? Went to Aspen Mental Health and left a correction notice. 1. Need Fire and Structural finals. 2. Complete pending corrections for Fire and 3. obtain Certificate of Occupancy. Above Items to be completed by 9/8/11. Employees gave me a card of Patrick Kirk (supervisor)......and said he would be taking care of this. O cdbbiej C ehehgcc
|
BLD-Final | 2/23/2011 | 2/25/2011 | 2/25/2011 | A | NR |
Jim Sly
|
|
|
late morning so fire life/safety pass---patrick Phone #: ###-#### Need Fire Final.
|
FIRE-Final Inspection | 2/23/2011 | 2/25/2011 | 2/25/2011 | A | FAIL |
Troy Cobbley
|
|
|
Repair all exit signs and emergency lights, remove the dead bolt from the east exterior exit door and resubmit plans with a corrected floor layout.
|