BLD-Final | 7/28/2011 | 7/28/2011 | 7/28/2011 | P | PASS |
Mike Jordan
|
|
|
Rusten Phone #: ###-####
|
DOC - Permit Finaled | 7/28/2011 | 7/28/2011 | 7/28/2011 | P | PASS |
Mike Jordan
|
|
|
Residential certificate of occupancy was issued.
|
BLD-Energy code compliance | 5/24/2011 | 5/24/2011 | 5/24/2011 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 5/23/2011 | 5/24/2011 | 5/24/2011 | A | FAIL |
Mike Jordan
|
|
|
Still needs to encapsulate insulation at vaulted ceiling area.
|
BLD-Energy code compliance | 5/23/2011 | 5/23/2011 | 5/23/2011 | A | CANC |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 5/23/2011 | 5/23/2011 | 5/23/2011 | P | FAIL |
Mike Jordan
|
|
|
rustin Phone #: ###-####. Needs to encapsulate insulation at vaulted ceiling and at truss.
|
BLD-Framing/Rough-in | 5/23/2011 | 5/23/2011 | 5/23/2011 | P | PASS |
Mike Jordan
|
|
|
rustin Phone #: ###-####
|
BLD-Framing/Rough-in | 5/20/2011 | 5/20/2011 | 5/20/2011 | P | CANC |
Jim Storey
|
|
|
Rustin Phone #: ###-#### R703.6.3 Water-resistive barriers. Water-resistive barriers shall be installed as required in Section R703.2 and, where applied over wood-based sheathing, shall include a water-resistive vapor-permeable barrier with a performance at least equivalent to two layers of Grade D paper. framer to verify if as framed at tall wall can be justified or if 8" oc stud spaciing per engineering to be corected.// load transpher of beams to ft north side of great rm west end.//nail top chord and webs of second floor girder truss t36/ fur out wing wall at furnce to 2x6 for r-19 insulation.
|
BLD-Foundation | 4/7/2011 | 4/7/2011 | 4/7/2011 | P | PASS |
Mike Jordan
|
|
|
jay Phone #: ###-####
|
BLD-Footing | 4/6/2011 | 4/6/2011 | 4/6/2011 | P | PASS |
Mike Jordan
|
|
|
jay Phone #: ###-####
|