Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD11-00351
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameMICRON B50 R&D EXPANSION
Customer NumberC15044
ePlanReviewNo
Description
Micron Building 50 - Fab 4 R&D Building - (Foundation and Underground Utilities Only) - This permit is issued to pour footings and foundation and do underground utilities for the future construction of Micron Building #50. The foundation work will include pouring a reinforced concrete mat floor, two foot wide reinforced concrete foundation wall and two foot by two foot reinforced concrete columns that will support future pre-cast concrete waffle floor system. The column will be placed at 16 inches on center. The subfab floor lever will be 25.5 feet below the main fab floor level. The floor area of the subfab is 71,205 sq. ft.. This permit also includes the electrical grounding system that is poured into the 32 inch mat floor foundation. Work under this permit shall not proceed beyond the pour of the foundation until final approval of plans and issuance of the full building permit. That permit has not yet been applied for. As owner or designated agent, I acknowledge that I am performing this work at my own risk without assurance that the permit for the entire building structure will be granted, and I agree to make any modifications to the early foundation work performed as may be required to comply with the City Codes and the final approved building plans and conditions. All per engineered plans on file. Rough Grading Permit BLD11-00147 JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection3/26/20133/26/20133/26/2013 DONE
DetailsJim Storey
DOC - Permit Finaled3/26/20133/26/20133/26/2013PPASS
DetailsJim Storey
BLD-Final12/20/201212/20/201212/20/2012PPASS
DetailsJim Storey
BLD-Conference8/25/20118/30/20118/31/2011PDEFR
DetailsForrest France
BLD-Conference8/25/20118/30/20118/30/2011PDEFR
DetailsJim Storey
1:00 apt/w eric and micron at micron.
BLD-Other8/25/20118/25/20118/25/2011PPASS
DetailsJim Storey
grade beam and footings ok east end of fab. sims area west end wip ok.
BLD-Concrete8/17/20118/18/20118/18/2011PPASS
DetailsJim Storey
BLD-Conference8/12/20118/12/20118/12/2011APASS
DetailsJim Storey
reviewed reports.
BLD-Concrete8/10/20118/11/20118/11/2011PPART
DetailsJim Storey
BLD-Concrete7/15/20117/21/20117/21/2011ADONE
DetailsJim Storey
>> Inspection requested via web by Joel Hartman
BLD-Concrete6/14/20116/15/20116/15/2011PPASS
DetailsJim Storey
>> Inspection requested via web by Joel Hartman
BLD-Concrete6/4/20116/6/20116/6/2011PPASS
DetailsJim Storey
>> Inspection requested via web by Joel Hartman
BLD-Concrete6/1/20116/2/20116/2/2011APASS
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Joel Hartman colm c line ok
BLD-Conference5/20/20115/23/20115/23/2011APASS
DetailsJim Storey
reviewed a line as to miss set of col. steel for corection ok/ able to modify forms to ajust for misalinment of vert rebar at footting/ exterior water control in progress as well as back fill with protor testing complet of matirial that meets spec's.west wall area.
BLD-Concrete5/19/20115/20/20115/20/2011APART
DetailsJim Storey
s line rebar appears ok per beam sch. rfi 33. work in progress.
BLD-Concrete5/18/20115/19/20115/19/2011ACANC
DetailsJim Storey
>> Inspection requested via web by Joel Hartman
BLD-Concrete5/11/20115/18/20115/18/2011PCANC
DetailsJim Storey
>> Inspection requested via web by Joel Hartman rain out rolled over.
BLD-Concrete5/11/20115/17/20115/17/2011PPASS
DetailsJim Storey
Columns >> Inspection requested via web by Joel Hartman s line/ north wall 7 col ok/ reviewed up to #44 rfi.
BLD-Concrete5/11/20115/16/20115/16/2011PCANC
DetailsJim Storey
Columns >> Inspection requested via web by Joel Hartman
BLD-Concrete5/11/20115/13/20115/13/2011PPASS
DetailsJim Storey
Mat Slab >> Inspection requested via web by Joel Hartman mat slab complet.
BLD-Concrete5/11/20115/12/20115/12/2011PPASS
DetailsJim Storey
Wall pour >> Inspection requested via web by Joel Hartman
BLD-Concrete5/11/20115/11/20115/11/2011PPASS
DetailsJim Storey
Wall pour. Phone #: ###-#### >> Inspection requested via web by Harry Thompson west wall to corner nort side.
BLD-Conference5/11/20115/16/20115/11/2011PCANC
DetailsJim Storey
Columns >> Inspection requested via web by Joel Hartman Inspection cancelled from web by: Joel Hartman
BLD-Concrete5/9/20115/10/20115/10/2011APART
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Harry Thompson first 5 col on s line bar adjustment in progress w si oversite.// picked up rfi's and reviewed rfi on s line as well as up coming isues not clear on the plan or changes of confiugeration.
BLD-Concrete5/4/20115/6/20115/5/2011APASS
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Harry Thompson walk about ok w/si
BLD-Concrete5/4/20115/5/20115/5/2011APASS
DetailsJim Storey
Column pours Phone #: ###-#### >> Inspection requested via web by Harry Thompson si/ok
BLD-Concrete5/3/20115/3/20115/4/2011PPASS
DetailsJim Storey
More interior column pours. Phone #: ###-#### >> Inspection requested via web by Harry Thompson col and wall 4 ok w/si
BLD-Concrete4/29/20115/2/20115/3/2011APASS
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Harry Thompson
BLD-Foundation4/27/20114/29/20114/29/2011PPASS
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by Harry Thompson slab pour # 4 ok/ colm.grid 16 r thru m 6 thru 4 grid w to v. ok. verified rfi0024 as to extra bar requirment ok.
BLD-Concrete4/25/20114/26/20114/26/2011APASS
DetailsJim Storey
Rebar inspection for walls. Phone #: ###-#### >> Inspection requested via web by Harry Thompson wallgrid 6-16 ok rebar insp. si pending. line v.
BLD-Foundation4/22/20114/22/20114/22/2011PPASS
DetailsJim Storey
wall and slab rebar ok #3
BLD-Footing4/21/20114/21/20114/21/2011PPASS
DetailsJim Storey
eric - rebar Phone #: ###-#### grid 6 7 8 wall location slab 2# a line.
BLD-Foundation4/15/20114/15/20114/15/2011PPASS
DetailsJim Storey
This is for the North half of the mechanical slab.
Gridlines V-S.1/1-6. Phone #: ###-#### >> Inspection requested via web by Harry Thompson 2nd placement 8.1 to 8 grid.
BLD-Concrete4/14/20114/14/20114/14/2011APASS
DetailsJim Storey
reviewed si formman as to sch and placement of first slab/foottings verified that I had received the e-reports and it was working well. will be back for ft insp. slab #2 pm friday.
BLD-Footing4/8/20114/8/20114/11/2011PPASS
DetailsJim Storey
This inspection is for the foundation slab pour we are doing Monday the 11th at 3:00 am. Strata will perform the rebar and concrete inspections. Phone #: ###-#### >> Inspection requested via web by Harry Thompson
BLD-Footing4/6/20114/6/20114/6/2011PPASS
DetailsJim Storey
harry Phone #: ###-#### si on site elavator pit