Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD11-00390
StatusFinaled
Name MARK H BOWEN CMS
Site Address 5305 W IRVING ST
Project NameSIMPLOT GREENHOUSE ADDITION
Customer Number 
ePlanReviewNo
Description
Simplot Greenhouse Addition- To construct a new 6,790 square foot, one story, office and greenhouse addition on the west side of an existing 4,320 square foot, one story greenhouse building. The addition is constructed of pre-engineered metal building with metal roofing and siding at the office portion of the building and polycarbonate roof and wall panels at the greenhouse portion of the building. There is an insulated metal stud wall with store front glazing separating the office from the greenhouse. The addition will include a 1,895 sq. ft. office on the north end, a 650 sq. ft. headhouse between the office and greenhouse, a 3,235 sq. ft. greenhouse and a 650 sq. ft. bug screen area at the south end of the addition. This permit also includes related site improvements. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/13/20119/14/20119/13/2011APASS
DetailsTom Arcoraci
mark please call before going out as he needs to be there. Phone #: ###-#### ok for perm occ when others sign perm
FIRE-Final Inspection9/9/20119/9/20119/9/2011APASS
DetailsForrest France
BLD-Final9/9/20119/9/20119/9/2011PCANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Mark Bowen
BLD-Framing/Rough-in7/18/20117/18/20117/18/2011PPASS
DetailsTom Arcoraci
Approved Plans on site in greenhouse. Insulation and drywall due to start Tuesday morning. Call me with any questions or concerns. Phone #: ###-#### >> Inspection requested via web by Mark Bowen
BLD-Conference6/14/20116/14/20116/14/2011PPASS
DetailsTom Arcoraci
Ask for Kevin. The subject is the methodology of installing the roof panels, liner panels and insulation so as to not circumvent the energy code inspection process. Phone #: ###-#### >> Inspection requested via web by Mark Bowen
BLD-Foundation5/25/20115/26/20115/26/2011APASS
DetailsTom Arcoraci
We would prefer late morning around 11:00 if that is possible.

Thank you Phone #: ###-#### >> Inspection requested via web by Mark Bowen
BLD-Footing5/17/20115/18/20115/18/2011PPART
DetailsMike Jordan
>> Inspection requested via web by Mark Bowen. inspected by 408.
BLD-Footing5/13/20115/16/20115/16/2011ACANC
DetailsTom Arcoraci
Phone #: ###-#### >> Inspection requested via web by Mark Bowen Inspection cancelled from web by: Mark Bowen