Permit Information
Permit NumberBLD11-00397
StatusFinaled
Name LYDIA MERRILL
Site Address 615 S 9TH ST
Project NameMARDI GRAS
Customer Number 
ePlanReviewNo
Description
(MARDI GRAS BALLROOM - NEW NORTHEAST ENTRANCE - STRUCTURAL AND SAFETY UPGRADES - CZC11-00023) This building is not fire sprinklered. To perform structural and safety upgrades in the Northeast corner of an existing 11,686 square foot assembly building. Work is to include a concrete footing to stabilize an existing footing and foundation, compacted fill, concrete slab on grade, wood stud parapets, wood beams, wood column and trimmers, re-built wood joist floor system, roof cricket, double leaf exterior door with sidelights, masonry infill wall, concrete infill foundation, a masonry shear wall, a new 2 riser interior stairway, exterior finishes, and interior finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. Concrete, masonry, welding, soil compaction, and epoxy anchors all require Special Inspection. This permit does NOT establish a Certificate of Occupancy for this building. The Certificate of Occupancy will be established under permit BLD09-01470 after the work authorized under that permit and this permit is completed and approved. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled  3/11/2013 DONE
BLD-Final12/3/201212/4/201212/4/2012APASS
DetailsDave Hannah
per your request
FIRE-Final Inspection12/3/201212/3/201212/3/2012PPASS
DetailsForrest France
Scope of work completed. Correction items verified for compliance. Fire life safety passed.
FIRE-Conference10/3/201210/3/201210/3/2012PDONE
DetailsForrest France
On site meeting with building owner and Capt. Goldsmith regarding project status and items needed for final. Approved plan set not available on site.
BLD-Final9/11/20129/12/20129/12/2012APART
DetailsDave Hannah
Tim Phone #: ###-#### walked project with tim ever close needs to get a fire life saftey inspection.
BLD-Conference8/24/20128/24/20128/24/2012PPEND
DetailsDave Hannah
Status? talked with tim today he is working on hand rails hopes to get finals some time next week?
BLD-Final8/6/20128/15/20128/16/2012PPEND
DetailsDave Hannah
Status? see history
BLD-Conference8/1/20128/1/20128/1/2012APEND
DetailsDave Hannah
Dave and I reviewed current status with owner. Lacking handrail and hardwired exit sign for final inspection (about 2 weeks).
BLD-Framing/Rough-in12/6/201112/6/201112/7/2011PPASS
DetailsDave Hannah
Don or Tim Phone #: ###-####
BLD-Framing/Rough-in9/27/20119/28/20119/28/2011APASS
DetailsDave Hannah
Tim Phone #: ###-#### last grouting of cmu wall ok
BLD-Framing/Rough-in9/23/20119/26/20119/26/2011APASS
DetailsDave Hannah
ken Phone #: ###-#### cmu 3rd lift ok to grout
BLD-Framing/Rough-in9/22/20119/23/20119/23/2011APART
DetailsDave Hannah
IN fill--Tim Phone #: ###-#### cmu ok to grout second lift
BLD-Framing/Rough-in9/21/20119/22/20119/22/2011APART
DetailsDave Hannah
Brick Wall-Tim Phone #: ###-#### ok to grout first lift
BLD-Footing8/18/20118/19/20118/19/2011APART
DetailsDave Hannah
kim Phone #: ###-#### ok to pour floor slab ,stem wall and column pad
BLD-Conference10/31/201211/1/2012 P 
DetailsDave Hannah
Status? Remaining requirements and time frame for completion?
BLD-Conference6/29/20127/2/2012 P 
DetailsDave Hannah
Status?