(CITY CENTRE GARAGE STAIR REPLACEMENT PROJECT) (8-16-11 PLAN MODIFICATION TO CHANGE THE BARRIER DESIGN AT THE LOW HEADROOM CONDITION AT THE STREET LEVEL.) Fire sprinklers used to meet high rise provisions. To remove and replace 2 existing 80 foot tall exterior stairways serving an existing 8 story parking garage. All flights of stairs and intermediate landings will be demolished and removed. Work is to include new precast concrete intermediate landings and new precast concrete flights of stairs. In addition, at each floor level landing, damaged concrete will be removed at the open edges of the slabs and replaced with new concrete. The existing bottom steel reinforcing bars, oriented perpendicular to the deck edges, where the slabs are spliced are required to be maintained and not cut. New steel guards and handrails will be installed. A thin layer of concrete topping will be applied over the existing concrete floor slab at elevator doors. Special Inspection is required for the work listed on Sheet S0.03. Precast work is required to be done by a fabricator approved by the Building Official. The work is required to comply with the approved drawings, with the plan review report, with the structural design, and with all applicable codes and ordinances. The use of public property shall be as approved and limited by ACHD. Barricades are required to route pedestrians and vehicles away from the construction sites to mitigate the danger imposed by falling objects. Egress during construction shall be as approved by the Fire Department. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/10/20142/10/20142/10/2014PPASS
DetailsDave Hannah
DOC - Permit Finaled2/10/20142/10/20142/10/2014PPASS
DetailsDave Hannah
BLD-Aging Inspection2/5/20142/7/20142/10/2014APASS
DetailsDave Hannah
BLD-Aging Inspection10/10/201310/10/201310/18/2013 PEND
DetailsDave Hannah
FIRE-Final Inspection5/29/20135/29/20135/29/2013APASS
DetailsForrest France
Life safety inspection completed and passed.
BLD-Aging Inspection5/7/20135/7/20135/7/2013ADONE
DetailsForrest France
Okay to final
BLD-Aging Inspection5/3/20135/3/20135/7/2013 PEND
DetailsDave Hannah
FIRE-Conference5/23/20125/23/20125/23/2012ADONE
DetailsForrest France
Regarding scope of permit attatched fire sprinkler work for replacement of existing system piping.
BLD-Final5/8/20125/8/20125/8/2012PPASS
DetailsDave Hannah
Please call -- Boyd Phone #: ###-####
BLD-Final1/12/20121/12/20121/12/2012APART
DetailsDave Hannah
Late AM---Rob Phone #: ###-#### ok to reopen the west stair tower we will final project in the spring
BLD-Final1/4/20121/5/20121/12/2012APART
DetailsDave Hannah
Late AM---Rob Phone #: ###-####
FIRE-Final Inspection1/4/20121/5/20121/5/2012APASS
DetailsForrest France
Fire life safety inspection for the scope of work completed. Locks at the egress side doors from the parking deck to the stair towers to be removed prior to structural final as agreed.
BLD-Final10/12/201110/13/201110/14/2011APART
DetailsDave Hannah
Rob Phone #: ###-#### ok to reopen east stairtower and move to west stair
BLD-Final10/5/201110/10/201110/10/2011ANR
DetailsDave Hannah
Rob Phone #: ###-####
BLD-Conference10/4/201110/4/201110/5/2011PPART
DetailsDave Hannah
Rob Phone #: ###-#### walked stairs on east end all looks ok they will finish monday
BLD-Concrete8/12/20118/15/20118/16/2011APART
DetailsDave Hannah
concrete coming at 10// 6th floor// Rob Phone #: ###-####
BLD-Concrete8/5/20118/8/20118/8/2011APART
DetailsDave Hannah
rob - concrete at 10:00 Phone #: ###-####
BLD-Concrete7/29/20117/29/20117/29/2011PPART
DetailsDave Hannah
rob Phone #: ###-#### spec inspection on site foe rebar and concrete
BLD-Concrete7/19/20117/19/20117/20/2011PPART
DetailsDave Hannah
rob - pouring at 1 Phone #: ###-####
BLD-Concrete7/8/20117/8/20117/8/2011PPASS
DetailsJim Storey
Rob-please call prior to inspection-pouring concrete at 1:00 Phone #: ###-#### 2nd floor landing ok