Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD11-00416
StatusFinaled
Name JORDAN WILCOMB CONSTRUCTION
Site Address 825 W FORT ST
Project NameSt. Joseph's Elementary School
Customer Number 
ePlanReviewNo
Description
(ST. JOSEPH'S ELEMENTARY SCHOOL - EXPANSION) To add a two story, 7,189 sq. ft. addition on the south side of existing gym. Work includes completely demolishing a 2,400 sq. ft. one story structure attached to the south side of gym; and select interior demolition on the 1st & 2nd floor of existing school in area of new addition. Construct footings / foundation for new 2-story addition on south side of gym; exterior & interior walls, floor and roof systems; interior corridor and stairway; finishes, millwork, mechanical, electrical, plumbing, sprinkler and alarm system modifications; accessible interior and exterior route, accessible restrooms and drinking fountains. All per reviewed plans. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/22/201112/23/201112/23/2011APASS
DetailsTony Young
t j Phone #: ###-####,, perm occupancy ok now
BLD-Final11/8/201111/8/201111/9/2011PPART
DetailsTony Young
john Phone #: ###-####,, temp occupancy ok untill trades are fully finaled
BLD-Final11/4/201111/7/201111/9/2011PPART
DetailsTony Young
john Phone #: ###-####,, temp occ ok,, need full sign off from trades
FIRE-Final Inspection11/4/201111/7/201111/7/2011PPASS
DetailsForrest France
Corrections verified for completion. Fire life safety passed.
FIRE-Conference10/26/201110/26/201110/26/2011PDONE
DetailsForrest France
Regarding project related fire alarm permit status and final.
BLD-Final10/12/201110/13/201110/13/2011ANR
DetailsTony Young
John Phone #: ###-####
FIRE-Final Inspection10/12/201110/13/201110/13/2011AFAIL
DetailsTroy Cobbley
The project related fire alarm and fire sprinkler permits need to be addressed. Also see the city approved plans, 1st approval, for the exit signs and emergency lights that are either missing or do not function. Also many of the existing exit lights and emergency lights are not functional and will need repaired prior to a final sign off.
BLD-Conference10/12/201110/12/201110/12/2011PPART
DetailsTony Young
John Phone #: ###-####,, walk through
FIRE-Final Inspection10/12/201110/12/201110/12/2011PCANC
DetailsTroy Cobbley
Overbooked. Rescheduled for tomorrow.
FIRE-Final Inspection10/12/201110/12/201110/12/2011PCANC
DetailsTroy Cobbley
Duplicate inspection
BLD-Final10/7/201110/10/201110/12/2011PNR
DetailsTony Young
Late afternoon--John Phone #: ###-####,, conf only
FIRE-Final Inspection10/7/201110/10/201110/10/2011PCANC
DetailsTroy Cobbley
To be canceled per Scott Arellano. Tom Gainer has visited job site and provided update on job status to Scott.
BLD-Final10/7/201110/7/201110/7/2011PNR
DetailsTony Young
Late afternoon--John Phone #: ###-####,, walk through only
FIRE-Final Inspection10/5/201110/6/201110/6/2011PNR
DetailsForrest France
john Phone #: ###-####
FIRE-Sprinkler Rough-in10/3/201110/3/201110/3/2011PPART
DetailsForrest France
Overhead work okayed for cover with the exception of the first floor corrdior at the new addition.
BLD-Other9/27/20119/27/20119/27/2011PPASS
DetailsTony Young
john - ceiling grid Phone #: ###-####
BLD-Framing/Rough-in9/16/20119/16/20119/16/2011PPART
DetailsMike Jordan
Cieling grid inspection please-John Phone #: ###-####. HArdlids in girls and boys restroom, 1st. floor. Pending fire sprinkler rough in approvals.
FIRE-Conference9/13/20119/13/20119/13/2011PDONE
DetailsForrest France
Regarding fire alarm manual pull station locations.
FIRE-Final Inspection9/12/20119/12/20119/12/2011PPART
DetailsForrest France
Inspection request intended for fire sprinkler cover at the second floor remodeled classroom. Noted one sprinkler head to be replaced due to mechanical damage of the deflector.
BLD-Framing/Rough-in9/12/20119/12/20119/12/2011PPART
DetailsTony Young
john - ceiling grid Phone #: ###-####,, 2nd floor existing room ok pending trades
BLD-Framing/Rough-in9/1/20119/2/20119/2/2011PPART
DetailsDave Hannah
John phone ####-#### framing rooms 113 thru 117 ok to insulate
BLD-Final8/30/20118/31/20119/1/2011PNR
DetailsTony Young
john - temp occupancy Phone #: ###-####
BLD-Conference8/23/20118/24/20119/1/2011PPART
DetailsTony Young
partial final-John Phone #: ###-####,, kinder gaerten room and offices ok pending others
FIRE-Final Inspection8/30/20118/31/20118/31/2011ANR
DetailsForrest France
BLD-Other8/30/20118/30/20118/30/2011PPART
DetailsTony Young
ceiling grid insp//John Phone #: ###-####
office area ok pending others
BLD-Framing/Rough-in8/24/20118/25/20118/26/2011PPASS
DetailsTony Young
john Phone #: ###-####,, classrooms ok
BLD-Conference8/23/20118/24/20118/25/2011PDONE
DetailsForrest France
Regarding occupancy at the remodeled classroom 1st floor.
BLD-Other8/23/20118/23/20118/24/2011PPART
DetailsTony Young
Ceiling grid--John Phone #: ###-####,, ok pending trades in admin and kindergarden area
BLD-Framing/Rough-in8/19/20118/19/20118/22/2011PDONE
DetailsTom Arcoraci
john Phone #: ###-####
BLD-Framing/Rough-in8/19/20118/22/20118/22/2011APART
DetailsTom Arcoraci
john Phone #: ###-#### wip ok walls 2nd story
BLD-Conference8/18/20118/19/20118/19/2011APART
DetailsTony Young
john Phone #: ###-####,, on site conference with all parties,, e-mail to all parties will follow up by Scott A., (Fire) issues are construction will still be going on while school is starting,, alternate egress issues. Possible changes in the mechanical system, but will take place later (3-4 weeks)
BLD-Conference8/19/20118/19/20118/19/2011PDONE
DetailsForrest France
john Phone #: ###-####,, 1:30 pm if possible * NOTE: On site conference completed by S. Arellano.
BLD-Wall cover8/12/20118/15/20118/19/2011APASS
DetailsTony Young
john Phone #: ###-####,, re look at shear,, shear ok now,, 2nd floor walls ok to insulate
FIRE-Conference8/18/20118/19/20118/19/2011ADONE
DetailsScott Arellano
Onsite Meeting *SJA* See conditions for TEMP occupancy in attached documents.
BLD-Wall cover8/16/20118/16/20118/16/2011PPART
DetailsTony Young
john - shear inspection Phone #: ###-####,, exterior shear ok
BLD-Framing/Rough-in8/15/20118/16/20118/16/2011APART
DetailsTony Young
john - shear inspection Phone #: ###-####,, 2nd floor ok
BLD-Framing/Rough-in8/12/20118/12/20118/15/2011PPART
DetailsTony Young
john Phone #: ###-####,, SHEAR INSPECTION,, MOST OK ,, just needs a more in a few areas
BLD-Framing/Rough-in8/8/20118/9/20118/9/2011APART
DetailsTony Young
framing, hold down & roofing//John Sanchez Phone #: ###-####,, fireblocking,, work in progress,, ok
BLD-Framing/Rough-in8/5/20118/8/20118/8/2011PPART
DetailsTony Young
framing, hold down & roofing//John Sanchez Phone #: ###-####,, roof nailing ok,, hold downs ok,, walk through with framer and super,, ok,, some verbal fixes,, mainly straps and fireblocks,, hidden straps ok to cover
BLD-Conference7/28/20117/28/20117/29/2011PPASS
DetailsTony Young
take C. Westfall,, walk through
BLD-Conference7/27/20117/28/20117/28/2011APASS
DetailsTony Young
take C. Westfall,, walk through,,, GACR
BLD-Conference7/22/20117/26/20117/26/2011PPART
DetailsTony Young
1pm please-- John Phone #: ###-####
?s on a future temp occupancy for admin part..
FIRE-Conference7/22/20117/26/20117/26/2011PDONE
DetailsForrest France
Regarding project schedule and related FIR trade permit work.
BLD-Concrete7/13/20117/13/20117/13/2011PPART
DetailsTony Young
JOHN Phone #: ###-####,, S. I. report
BLD-Footing7/11/20117/12/20117/12/2011APART
DetailsTony Young
john Phone #: ###-####,, Strata on site,, ok pending report
BLD-Footing7/5/20117/6/20117/6/2011PPART
DetailsTony Young
john - pouring at 3:00 Phone #: ###-####,, ramp walls and piers,, ok pending special inspection report
BLD-Footing7/1/20117/1/20117/1/2011PPART
DetailsTony Young
john -rebar - pouring at 1:30 - floor inspection also Phone #: ###-####,, ftgs for ADA ramp,, and 3 columns,, ok pending special inspection reports
BLD-Framing/Rough-in6/29/20116/29/20116/29/2011PPART
DetailsTony Young
JOHN Phone #: ###-####,, under floor shear walls.. ok,,// . anchor bolts,, adding at ends of plates,, // epoxy shear holddowns ok pending special inspections
BLD-Footing6/23/20116/24/20116/24/2011APART
DetailsTony Young
john - rebar - pouring at 9 Phone #: ###-####,, pending special inspection report
BLD-Footing6/21/20116/22/20116/22/2011APART
DetailsTony Young
john - rebar inspection Phone #: ###-####,, some walls,, some footings on west side,, special inspectors on site
BLD-Footing6/16/20116/17/20116/17/2011APART
DetailsTony Young
JOHN Phone #: ###-####,, pending special inspection report,, had to have contractor dig out an area of footing to make it 12" thick,, also had a short rebar lap,, (8") al this was after 1st S. I. looked at the job.. fix is in progress and concrete tester and job super was laid out on what was required,,, then ok to pour