BLD-Final | 6/1/2011 | 6/2/2011 | 6/2/2011 | P | PASS |
Mike Jordan
|
|
|
Jason Phone #: ###-####
|
DOC - Permit Finaled | 6/2/2011 | 6/2/2011 | 6/2/2011 | P | PASS |
Mike Jordan
|
|
|
Residential certificate of occupancy was isuued.
|
BLD-Final | 5/31/2011 | 6/1/2011 | 6/1/2011 | A | FAIL |
Mike Jordan
|
|
|
jason Phone #: ###-####. Provide CO2 detectors as required and certificate for blower door test or checlist.
|
BLD-Energy code compliance | 5/4/2011 | 5/5/2011 | 5/5/2011 | A | PASS |
Mike Jordan
|
|
|
jason - as soon as possible please Phone #: ###-####
|
BLD-Framing/Rough-in | 5/5/2011 | 5/5/2011 | 5/5/2011 | A | PASS |
Mike Jordan
|
|
|
jason - as soon as possible please Phone #: ###-####. All framing issues have been resolved.
|
BLD-Framing/Rough-in | 5/2/2011 | 5/3/2011 | 5/3/2011 | P | FAIL |
Mike Jordan
|
|
|
jason Phone #: ###-####. COmplete all fireblocking, Provide headers and aditional studs at point loads at roof framing, Provide total encapsulation of all exterior walls. ok to insulate.
|
BLD-Foundation | 4/6/2011 | 4/7/2011 | 4/7/2011 | A | PASS |
Mike Jordan
|
|
|
Ryan-Stem wall inspection please Phone #: ###-####
|
BLD-Footing | 4/5/2011 | 4/6/2011 | 4/6/2011 | A | PART |
Mike Jordan
|
|
|
RYAN Phone #: ###-####. Footing ok, noted that setbacks on approved plan are different than what concrete contractor has. Needs to either move footing or get new set backs approved. Contacted contractor and left message.
|
BLD-Foundation | 4/6/2011 | 4/6/2011 | 4/6/2011 | P | CANC |
Mike Jordan
|
|
|
late pm//stem wall ins//Ryan Phone #: ###-####
|