DOC - Permit Finaled | | | 5/1/2012 | | DONE |
Alexandra L. DeYoung
|
|
|
|
BLD-Final | 4/30/2012 | 4/30/2012 | 4/30/2012 | P | PASS |
Dave Hannah
|
|
|
SHAUN PLEASE CALL 30 MIN BEFORE Phone #: ###-####
|
BLD-Other | 4/13/2012 | 4/13/2012 | 4/13/2012 | P | PEND |
Dave Hannah
|
|
|
Entire scope of work must be completed prior to issuance of CO
|
BLD-Final | 4/10/2012 | 4/11/2012 | 4/11/2012 | A | FAIL |
Dave Hannah
|
|
|
Shawn Phone #: ###-#### vert grab bars wrong location and needs to change permit to show that the hvac work was not done under this permit.
|
BLD-Final | 4/10/2012 | 4/10/2012 | 4/10/2012 | P | DEFR |
Dave Hannah
|
|
|
Shawn Phone #: ###-####
|
FIRE-Final Inspection | 4/6/2012 | 4/9/2012 | 4/9/2012 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
FIRE-Final Inspection | 4/5/2012 | 4/6/2012 | 4/9/2012 | A | PART |
Forrest France
|
|
|
|
BLD-Final | 4/5/2012 | 4/6/2012 | 4/9/2012 | P | NR |
Dave Hannah
|
|
|
call 1/2 hr prior//Shawn Phone #: ###-####
|
FIRE-Conference | 4/6/2012 | 4/6/2012 | 4/6/2012 | P | DONE |
|
|
|
One emergency light battery not functioning; Door knob needs lever action hardware; additional exit sign needed.
|
FIRE-Sprinkler Rough-in | 3/5/2012 | 3/5/2012 | 3/5/2012 | A | PART |
Forrest France
|
|
|
Overhead work at the remodel area approved for ceiling cover. Lacking coverage below an existing overhead garage door, system is due annual inspection.
|
BLD-Framing/Rough-in | 3/2/2012 | 3/2/2012 | 3/2/2012 | A | PART |
Dave Hannah
|
|
|
shaun - please call 1/2 hr prior - late afternoon please Phone #: ###-####ok to cover phase one mens rest rooms
|
BLD-Framing/Rough-in | 2/29/2012 | 3/1/2012 | 3/2/2012 | P | CANC |
Dave Hannah
|
|
|
shaun - please call 1/2 hr prior - late afternoon please Phone #: ###-####
|
BLD-Conference | 2/28/2012 | 2/28/2012 | 2/28/2012 | P | PART |
Bob Archibald
|
|
|
Dave H, Ron with HCD and I walked site and reviewed current status. Framing request will be requested soon.
|