BLD-Final | 10/2/2013 | 10/3/2013 | 10/3/2013 | A | PASS |
Jim Sly
|
|
|
Jim Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 10/2/2013 | 10/3/2013 | 10/3/2013 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 9/5/2013 | 9/6/2013 | 9/6/2013 | A | FAIL |
Troy Cobbley
|
|
|
Provide city approved plans, provide fire extinguishers, repaire the exit signs, provide NFPA signage on the H occupancy doors, provide signage on the FACP/Electrical room doors and it appears that notes 1 - 7 have not been addressed for the ventilation.
|
FIRE-Final Inspection | 6/10/2013 | 6/11/2013 | 6/11/2013 | A | FAIL |
Troy Cobbley
|
|
|
Todays inspection was a cover for the underground supply line. Everything can be covered except for the locations of the thrust blocks which are not complete. Treasure valley fire is supervising the underground installation.
|
FIRE-Final Inspection | 6/10/2013 | 6/10/2013 | 6/10/2013 | P | CANC |
Troy Cobbley
|
|
|
Per Jeremiah the project is not ready for inspection. Will be rescheduled for inspection on underground supply piping to the fire sprinkler system.
|
FIRE-Final Inspection | 5/30/2013 | 6/4/2013 | 6/4/2013 | A | FAIL |
Troy Cobbley
|
|
|
The project related fire sprinkler permit needs to be addressed which includes all aspects of the underground supply piping to the fire sprinkler system. Also no city approved plans/notes were on site for an inspection.
|
BLD-Other | 9/25/2012 | 9/26/2012 | 9/26/2012 | A | PART |
Jim Sly
|
|
|
Roof inspection-Dave Jenkins Phone #: ###-#### Not quite complete .....but what is done is OK.
|
BLD-Framing/Rough-in | 8/1/2012 | 8/2/2012 | 8/2/2012 | P | PART |
Jim Sly
|
|
|
Dave Phone #: ###-#### Looked at ceiling joist connections to ledger and to top of wall at pop out rooms from main bldg.....West and North ends. Reviewed letter from Engineer of record as to how to make these connections........ which is different from appr. plan. Engineer has also physically inspected the connections.
|
BLD-Final | 1/25/2012 | 1/26/2012 | 1/26/2012 | P | NR |
Jim Sly
|
|
|
dave Phone #: ###-#### Looked at roof panels prior to installation.
|
BLD-Foundation | 11/8/2011 | 11/8/2011 | 11/8/2011 | P | PART |
Jim Sly
|
|
|
Dave Phone #: ###-#### CMU grouting North Bldg section.
|
BLD-Footing | 10/21/2011 | 10/21/2011 | 10/21/2011 | P | PART |
Jim Sly
|
|
|
Dave Phone #: ###-#### Footing and pad North side OK pending MTI special inspection tests and approvals.
|
BLD-Foundation | 10/7/2011 | 10/10/2011 | 10/10/2011 | A | PART |
Jim Sly
|
|
|
dave Phone #: ###-#### MTI on site......
|
BLD-Foundation | 10/4/2011 | 10/4/2011 | 10/4/2011 | P | PART |
Jim Sly
|
|
|
Dave Phone #: ###-####
|
BLD-Concrete | 9/8/2011 | 9/8/2011 | 9/8/2011 | P | PART |
Jim Sly
|
|
|
CMU-grout rebar inspection please-Dave Jenkins Phone #: ###-#### MTI on site.
|
BLD-Concrete | 9/1/2011 | 9/1/2011 | 9/1/2011 | P | PART |
Jim Sly
|
|
|
CMU-rebar --Dave Jenkins Phone #: ###-#### Select wall OK pending MTI special insp, tests and approvals.
|
BLD-Footing | 8/25/2011 | 8/25/2011 | 8/25/2011 | P | PART |
Jim Sly
|
|
|
dave - rebar Phone #: ###-#### OK pending MTI insp, tests and approvals.
|
BLD-Other | 8/17/2011 | 8/18/2011 | 8/18/2011 | A | PART |
Jim Sly
|
|
|
dave - CMU walls Phone #: ###-#### OK pend MTI special insp, tests and approvals.
|
BLD-Framing/Rough-in | 8/16/2011 | 8/16/2011 | 8/16/2011 | P | PEND |
Jim Sly
|
|
|
Dave Jenkins-CMU inspection please Phone #: ###-#### OK pending MTI special insp tests and approvals.
|
BLD-Other | 8/8/2011 | 8/9/2011 | 8/9/2011 | A | CANC |
Jim Sly
|
|
|
cmu block insp//Dave Jenkins Phone #: ###-#### OK pending MTI inspections, tests and approvals.
|
BLD-Foundation | 8/3/2011 | 8/4/2011 | 8/4/2011 | A | PASS |
Tom Arcoraci
|
|
|
dave Phone #: ###-#### spec insp
|
BLD-Foundation | 7/25/2011 | 7/26/2011 | 7/26/2011 | A | PART |
Jim Sly
|
|
|
dave Phone #: ###-#### Portion of North wall OK pending MTI special insp, tests and approvals.
|
BLD-Foundation | 7/20/2011 | 7/21/2011 | 7/21/2011 | A | PASS |
Tom Arcoraci
|
|
|
dave Phone #: ###-#### spec insp
|
BLD-Foundation | 7/15/2011 | 7/18/2011 | 7/19/2011 | P | PART |
Tony Young
|
|
|
Dave Phone #: ###-####,, engineer will also inspect,, walls on tank and west wall on east structure
|
BLD-Foundation | 7/13/2011 | 7/13/2011 | 7/13/2011 | P | PART |
Tom Arcoraci
|
|
|
dave Phone #: ###-####
|
BLD-Foundation | 7/11/2011 | 7/12/2011 | 7/12/2011 | A | PART |
Jim Sly
|
|
|
DAVE Phone #: ###-####East wall......OK Pendig MTI insp, tests & approvals
|
BLD-Foundation | 7/5/2011 | 7/6/2011 | 7/6/2011 | A | PART |
Jim Sly
|
|
|
Dave Phone #: ###-#### East wall ..4' high H occupancy....and South wall Main Bldg 8' high....OK pending MTI special insp, tests and approvals. Structural Engineer and Rick Cummings (City employee) have done visual inspections with pictures.
|
BLD-Foundation | 6/27/2011 | 6/28/2011 | 6/28/2011 | A | PART |
Jim Sly
|
|
|
dave Phone #: ###-#### Wall...OK pending MTI special insp, tests and approvals. Engineer has done a visual inspection on this wall.
|
BLD-Footing | 6/13/2011 | 6/13/2011 | 6/13/2011 | P | PART |
Jim Sly
|
|
|
dave Phone #: ###-#### OK pending MTI special inspections, tests and approvals. Footing pads for main bldg and H occupancy .
|