Permit Information
Permit NumberBLD11-00704
StatusFinaled
Name HN DEVELOPMENT SERVICES LLC
Site Address 321 S 8TH ST
Project NameBODO BLDG #4
Customer Number 
ePlanReviewNo
Description
(FIVE GUYS BURGER AND FRIES - BODO BUILDING #4 - 1ST STORY) (6-13-11 PLAN MODIFICATION TO CHANGE THE ROUTING AND SHAFT SYSTEM FOR THE GREASE DUCT. INSTEAD OF PENETRATING A 2-HR FIRE WALL, THE GREASE DUCT WILL BE KEPT INSIDE THE BUILDING UNTIL IT PENETRATES THE ROOF. IN LIEU OF USING A FACTORY-BUILT GREASE DUCT ASSEMBLY THAT INCORPORATES INTEGRAL ENCLOSURE MATERIALS, A FIELD-APPLIED 2 LAYER DUCT WRAP SYSTEM WILL BE INSTALLED ON THE OUTSIDE OF THE GREASE DUCT. FOR MUCH OF ITS LENGTH, THE ENTIRE ASSEMBLY WILL BE ENCLOSED WITHIN A 1-HR SHAFT. LISTING INFORMATION FOR THE 2 LAYER DUCT WRAP SYSTEM AND FOR THE 1-HR SHAFT SHALL BE PROVIDED TO THE STRUCTURAL INSPECTOR. THE 2 LAYER DUCT WRAP SYSTEM IS REQUIRED TO REDUCE CLEARANCES AND THE 1-HR SHAFT IS REQUIRED TO AVOID A THROUGH PENETRATION FIRE STOP SYSTEM.) Fire sprinklers used for building area increase and for fire area. To convert an existing 2,600 square foot tenant space into a restaurant. Work is to include 2 restrooms accessible to the disabled, interior nonbearing walls, suspended acoustical ceilings, 2 grease hoods, a 2-hr grease duct that penetrates a 2 hour fire wall, kitchen equipment, and interior finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in6/20/20116/21/20116/24/2011PPASS
DetailsDave Hannah
kery Phone #: ###-####
FIRE-Final Inspection6/16/20116/17/20116/17/2011APASS
DetailsForrest France
Fire life safety passed after finished corrections.
BLD-Final6/16/20116/17/20116/17/2011PPART
DetailsTom Arcoraci
Shane Phone #: ###-#### needs mech and zoning sign offs then ok for final
BLD-Other6/13/20116/14/20116/14/2011APART
DetailsDave Hannah
grid insp//shane ###-#### ok to cover ceiling after all other trades ok
BLD-Conference6/7/20116/8/20116/8/2011APEND
DetailsDave Hannah
Meet Dixie at 10:00 contractor will resubmit plans for relocation of hood ducting
FIRE-Conference6/7/20116/7/20116/7/2011PDONE
DetailsForrest France
On site visit with contractor regarding status of project related fire alarm, sprinkler and hood suppression permits.
BLD-Framing/Rough-in6/2/20116/3/20116/3/2011APASS
DetailsDave Hannah
bill Shane will be there to let you in Phone #: ###-####