Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD11-00715
StatusFinaled
Name FALASH & ROSS CONSTRUCTION
Site Address 1199 W SHORELINE DR STE 350
Project NameRiver Park Bldg Ste # 350
Customer Number 
ePlanReviewNo
Description
(IDAHO STATE BOARD OF PHARMACY – River Park Office Building – Ste # 350) Permit is to remodel an existing 4,852 square foot office space by separating the space into two tenant spaces, this space is 3,255 square feet and the west end left over is 1,597 square feet. This building is fully fire sprinklered for one-hour substitution. Approval contingent upon adhering to the approved plans on file and plan review report. Work to include: [installation / demolition of interior partition walls to create 11 offices, 3 storage rooms, a break room, a copy room, a conference room, and a reception area], installation of a new ceiling, relocating existing lighting, installation of new light switching, installation of new doors / accessible hardware, and finishes in compliance with chapter 8 of the 2009 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department.**TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/26/20118/26/20118/26/2011PPASS
DetailsDave Hannah
Please call 20min prior if possible--Gill Phone #: ###-#### ok for perm occ
FIRE-Final Inspection6/15/20116/15/20116/15/2011PPASS
DetailsForrest France
Fire life safety final passed. Existing rated corridor to be maintained or provide QR type sprinklers throughout the floor level per IBC 2009.
BLD-Final6/8/20116/9/20116/9/2011PPART
DetailsDave Hannah
call when on way//Gail Phone #: ###-#### ok for temp occ need to see if sidelights need to be rated or if corrador is rated or not becouse of fire sprinkler
FIRE-Final Inspection6/8/20116/9/20116/9/2011APASS
DetailsTroy Cobbley
life safety passed
FIRE-Conference6/3/20116/3/20116/3/2011PDONE
DetailsForrest France
Discussion with contractor regarding items for fire life safety final including door hardware, ceiling cover, existing duct detectors and project related fire sprinkler permit.
BLD-Framing/Rough-in6/2/20116/2/20116/3/2011PPART
DetailsDave Hannah
ceiling grid only call first Gil ###-####
BLD-Framing/Rough-in5/31/20115/31/20115/31/2011PNR
DetailsDave Hannah
Gil - ceiling grid - please call 1/2 hr prior so he can meet you there Phone #: ###-#### talked with gil and ceiling crew ok to install borders
BLD-Framing/Rough-in5/6/20115/6/20115/6/2011PPASS
DetailsDave Hannah
gil - please call 1/2 hr prior so he can meet you there Phone #: ###-####