BLD-Final | 10/5/2011 | 10/6/2011 | 10/6/2011 | A | PASS |
Dave Hannah
|
|
|
Call for access---Bruce Phone #: ###-####
|
DOC - Permit Finaled | 10/6/2011 | 10/6/2011 | 10/6/2011 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Grading Inspection | 10/6/2011 | 10/6/2011 | 10/6/2011 | A | DONE |
Terry Records
|
|
|
Final grading and drainage approved
|
BLD-Energy code compliance | 7/29/2011 | 7/29/2011 | 7/29/2011 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 7/27/2011 | 7/28/2011 | 7/29/2011 | P | PASS |
Dave Hannah
|
|
|
bruce Phone #: ###-####
|
BLD-Framing/Rough-in | 7/25/2011 | 7/27/2011 | 7/27/2011 | A | PART |
Dave Hannah
|
|
|
bruce Phone #: ###-#### ok to cover ext all but for the second floor at kitchen window area also need double trimmer at same window
|
BLD-Other | 7/12/2011 | 7/13/2011 | 7/13/2011 | A | FAIL |
Dave Hannah
|
|
|
structural steel & fire rated eaves//Bruce Wood Phone #: ###-#### eaves ok but shear failed steel colunm base ok to cover
|
BLD-Foundation | 6/7/2011 | 6/7/2011 | 6/7/2011 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 6/7/2011 | 6/7/2011 | 6/7/2011 | P | PASS |
Dave Hannah
|
|
|
wes Phone #: ###-####
|
BLD-Footing | 5/24/2011 | 5/24/2011 | 5/25/2011 | P | PASS |
Dave Hannah
|
|
|
st after lunch pouring footings at 1:30---Wes Phone #: ###-####
|