Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD11-00781
StatusFinaled
Name ESI
Site Address 650 N ARMSTRONG PL
Project NameWinco Foods Records Retention
Customer Number 
ePlanReviewNo
Description
Winco General Office - Records Storage Building - To construct a new 9,365 square foot, one story, masonry and steel framed record storage building and related site improvements. This building is being built on the north side of the existing Winco office building. This building is being structurally designed for a future second floor addition for a storage. This building is fully fire sprinkled. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/21/201110/21/201110/21/2011PPASS
DetailsMike Jordan
ok for perm. occ.
BLD-Final10/19/201110/19/201110/19/2011PPART
DetailsMike Jordan
Need final letter from special inspection agency. Everything else ok.
BLD-Final10/18/201110/19/201110/19/2011ACANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Chris Palmer. moved to pm.
FIRE-Final Inspection10/18/201110/19/201110/19/2011APASS
DetailsTroy Cobbley
life safety passed.
FIRE-Final Inspection9/19/20119/19/20119/19/2011PFAIL
DetailsTroy Cobbley
Life safety will be ok to final when the project related fire alarm permit has been passed.
FIRE-Final Inspection9/12/20119/13/20119/13/2011PCANC
DetailsTroy Cobbley
Phone #: ###-#### >> Inspection requested via web by Chris Palmer Inspection cancelled from web by: Chris Palmer
BLD-Final9/12/20119/13/20119/13/2011PCANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Chris Palmer Inspection cancelled from web by: Chris Palmer
BLD-Final9/9/20119/12/20119/12/2011PNR
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Chris Palmer
FIRE-Final Inspection9/9/20119/12/20119/12/2011PCANC
DetailsTroy Cobbley
Cancel per Chris Palmer
BLD-Final9/6/20119/8/20119/8/2011ANR
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Chris Palmer. Needs fire/life/safety.
FIRE-Final Inspection9/6/20119/7/20119/7/2011PFAIL
DetailsTroy Cobbley
Project is not ready for a final inspection due to the project related fire alarm permit. Per Ron Amandus, it is ok for Winco to begin moving in the items that are to be stored in this warehouse. No finals will be given until the fire alarm and all related life safety items have passed inspection.
FIRE-Alarm Testing9/6/20119/6/20119/6/2011PCANC
DetailsTroy Cobbley
No fire alarm testing was performed due to no permit for the fire alarm work. Stop work order was posted.
FIRE-Conference9/6/20119/6/20119/6/2011PDONE
DetailsTroy Cobbley
I found fire alarm work being performed without permits. I spoke to Jeremy with Allied General and Chris with ESI about the "stop work order" that I posted. Pictures of the stop work order and the installed devices were taken and sent to the fire alarm plan reviewer.
FIRE-Conference8/25/20118/25/20118/25/2011PDONE
DetailsTroy Cobbley
Went over racking issues with Chris Palmer
BLD-Energy code compliance8/17/20118/17/20118/17/2011PPASS
DetailsMike Jordan
Wall insulation at the perimeter framing. Phone #: ###-#### >> Inspection requested via web by Chris Palmer
BLD-Framing/Rough-in8/15/20118/16/20118/16/2011PPASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Chris Palmer. Interior steel stud walls for payroll storage room and perimeter fur out walls.
BLD-Concrete7/7/20117/8/20117/8/2011PDEFR
DetailsMike Jordan
CMU grout pour at 2pm. MTI will be onsite. Phone #: ###-#### >> Inspection requested via web by Chris Palmer. Special inspector on site.
BLD-Concrete7/6/20117/6/20117/6/2011PDEFR
DetailsMike Jordan
Special inspector on site.
BLD-Concrete7/5/20117/6/20117/6/2011APART
DetailsMike Jordan
Grout pour at CMU scheduled for 9:30am and 3:00pm. MTI scheduled to be onsite for both pours. Phone #: ###-#### >> Inspection requested via web by Chris Palmer. AMsonry grout at west wall 8 to 12 ft. elev.
BLD-Concrete7/5/20117/5/20117/5/2011PDEFR
DetailsMike Jordan
Masonry grout pour at 3pm today. MTI will be onsite. Phone #: ###-#### >> Inspection requested via web by Chris Palmer. Special inspector on site.
BLD-Concrete6/28/20116/28/20116/28/2011PPASS
DetailsMike Jordan
Rebar mat for SOG Phone #: ###-#### >> Inspection requested via web by Chris Palmer
BLD-Foundation6/27/20116/27/20116/27/2011PPASS
DetailsMike Jordan
Inspection of the insulation around the stem walls under slab. Phone #: ###-#### >> Inspection requested via web by Chris Palmer
BLD-Foundation6/21/20116/21/20116/21/2011PCANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Chris Palmer
BLD-Footing6/17/20116/20/20116/20/2011APART
DetailsMike Jordan
Pouring concrete at 2pm for the stem walls and spread footings. If at all possible, would like to schedule inspection for 11:00am - noon. Thank You. Phone #: ###-#### >> Inspection requested via web by Chris Palmer. Perimeter stemwall and interior column pad footings. PEnding special inspection.
BLD-Concrete6/14/20116/16/20116/16/2011ACANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Chris Palmer
BLD-Footing6/14/20116/16/20116/16/2011APART
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Chris Palmer. Perimeter footings. Will have special inspection.