FIRE-Final Inspection | 1/3/2012 | 1/4/2012 | 1/4/2012 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 1/3/2012 | 1/4/2012 | 1/4/2012 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Chris Palmer. OK for perm occ.
|
FIRE-Alarm Testing | 12/29/2011 | 12/30/2011 | 12/30/2011 | P | NR |
Forrest France
|
|
|
Final Fire Alarm test to be completed. Addition of (3) H/S. As discussed, late afternoon (4:30) is beneficial. Thanks Phone #: ###-#### >> Inspection requested via web by Chris Palmer
|
BLD-Final | 12/15/2011 | 12/15/2011 | 12/15/2011 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Chris Palmer
|
FIRE-Conference | 12/13/2011 | 12/13/2011 | 12/13/2011 | P | DONE |
Troy Cobbley
|
|
|
Chris with ESI and myself discussed the requirements for notification devices that will need to be installed in the new four person offices. There are two of these offices. I also verified spacing for the new notification device that was added in the conference room as referenced on the previous correction notice.
|
BLD-Framing/Rough-in | 11/29/2011 | 11/30/2011 | 11/30/2011 | P | PASS |
Mike Jordan
|
|
|
Inspection of the grid patch back in the new office build out. I can meet onsite at 3:30 pm if necessary. Thanks! Phone #: ###-#### >> Inspection requested via web by Chris Palmer
|
BLD-Framing/Rough-in | 11/21/2011 | 11/22/2011 | 11/22/2011 | A | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Chris Palmer. Interior steel stud demissing walls for new offices and cubicles, phase 2.
|
BLD-Final | 10/31/2011 | 10/31/2011 | 10/31/2011 | A | PART |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Chris Palmer. Ok to occupy phase 2 only. Needs to submit plan mod for additional work.
|
FIRE-Final Inspection | 10/31/2011 | 10/31/2011 | 10/31/2011 | A | FAIL |
Troy Cobbley
|
|
|
Life safety in phase II is passed.
|
BLD-Other | 10/12/2011 | 10/12/2011 | 10/12/2011 | P | PASS |
Mike Jordan
|
|
|
Grid patch in inspection in the new TI space. Phone #: ###-#### >> Inspection requested via web by Chris Palmer
|
BLD-Final | 10/8/2011 | 10/10/2011 | 10/10/2011 | P | CANC |
Mike Jordan
|
|
|
Above Ceiling Final. Phone #: ###-#### >> Inspection requested via web by Craig Leavitt Inspection cancelled from web by: Craig Leavitt
|
BLD-Final | 10/4/2011 | 10/4/2011 | 10/4/2011 | P | CANC |
Mike Jordan
|
|
|
New restrooms final. Please call for building access. Phone #: ###-#### >> Inspection requested via web by Chris Palmer
|
BLD-Conference | 10/4/2011 | 10/4/2011 | 10/4/2011 | P | PART |
Mike Jordan
|
|
|
Inspection on completed restrooms. All life sfaety is operational, ada ok. Ok to use pending plumbing ok.
|
BLD-Framing/Rough-in | 9/19/2011 | 9/20/2011 | 9/20/2011 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Chris Palmer. Interior steel stud framed walls for new offices were records storage was previously.
|
BLD-Framing/Rough-in | 8/15/2011 | 8/16/2011 | 8/16/2011 | P | PASS |
Mike Jordan
|
|
|
Restroom framing inside the existing general office building. Phone #: ###-#### >> Inspection requested via web by Chris Palmer. Interior steel stud walls for new restroom.
|
BLD-Concrete | 8/8/2011 | 8/8/2011 | 8/8/2011 | P | PASS |
Mike Jordan
|
|
|
Plumbing trenches for new restrooms in the existing general office Phone #: ###-#### >> Inspection requested via web by Chris Palmer
|
BLD-Framing/Rough-in | 8/3/2011 | 8/3/2011 | 8/3/2011 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Chris Palmer office walls ok
|
FIRE-Final Inspection | 7/26/2011 | 7/26/2011 | 7/26/2011 | A | PART |
Troy Cobbley
|
|
|
Partial final for the Phase I portion of the TI. See the city approved plans for three new offices, storage room and HIPA storage room where life safety is passed. Near the three new offices there are two overspaced sprinklers and fire alarm audio/visual modifications that are needed.
|
BLD-Other | 7/25/2011 | 7/25/2011 | 7/25/2011 | P | PASS |
Tom Arcoraci
|
|
|
Phase I Partial Final Phone #: ###-#### >> Inspection requested via web by Chris Palmer ok pending fire ok
|
BLD-Framing/Rough-in | 7/1/2011 | 7/1/2011 | 7/1/2011 | A | PART |
Mike Jordan
|
|
|
Framing in the Phase I of the GO TI Phone #: ###-#### >> Inspection requested via web by Chris Palmer. Interior steel stud framed walls at phase 1, needs to remoce screws from topplates to grid and support wall to structure. Also pend. electrical inspection.
|
BLD-Framing/Rough-in | 6/30/2011 | 6/30/2011 | 6/30/2011 | P | NR |
Mike Jordan
|
|
|
Phase I section of General Office TI Phone #: ###-#### >> Inspection requested via web by Chris Palmer
|