BLD-Final | 12/18/2012 | 12/20/2012 | 12/20/2012 | P | PASS |
Jim Storey
|
|
|
steve Phone #: ###-####
|
FIRE-Final Inspection | 12/18/2012 | 12/19/2012 | 12/19/2012 | P | PASS |
Forrest France
|
|
|
|
BLD-Conference | 10/1/2012 | 10/3/2012 | 10/3/2012 | A | PART |
Jim Storey
|
|
|
look at chem tray fire caulking to close outer opening in sheetrock. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes sdock side ok
|
BLD-Conference | 8/21/2012 | 8/22/2012 | 8/22/2012 | A | PASS |
Jim Storey
|
|
|
Firewall penetrations at the chem building. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
|
BLD-Final | 8/3/2012 | 8/6/2012 | 8/6/2012 | A | PASS |
Jim Storey
|
|
|
James Phone #: ###-#### phase 2 east half of bld50# phase 2 ok on temp.
|
BLD-Final | 8/2/2012 | 8/3/2012 | 8/6/2012 | P | NR |
Jim Storey
|
|
|
James Phone #: ###-#### hardware needs instaled
|
FIRE-Final Inspection | 8/3/2012 | 8/3/2012 | 8/3/2012 | P | PART |
Forrest France
|
|
|
"Phase two" area including K line east approved for temporary occupancy. Final pending finishes at the chemical building, project related FIR permit finals and noted correction items.
|
FIRE-Final Inspection | 8/2/2012 | 8/2/2012 | 8/3/2012 | P | NR |
Forrest France
|
|
|
|
BLD-Final | 8/2/2012 | 8/2/2012 | 8/2/2012 | P | NR |
Jim Storey
|
|
|
James Phone #: ###-####
|
FIRE-Final Inspection | 7/31/2012 | 8/1/2012 | 8/2/2012 | P | NR |
Forrest France
|
|
|
James Phone #: ###-#### - life saety
|
BLD-Framing/Rough-in | 7/18/2012 | 7/19/2012 | 7/19/2012 | A | NR |
Jim Storey
|
|
|
Phone #: 36088231 >> Inspection requested via mobile web by rustin
|
BLD-Conference | 7/11/2012 | 7/12/2012 | 7/12/2012 | A | PART |
Jim Storey
|
|
|
JOEL Phone #: ###-#### east n/s stair fire riser rm fire stop fan protection/
|
BLD-Other | 7/9/2012 | 7/10/2012 | 7/11/2012 | A | DEFR |
Jim Storey
|
|
|
JOEL Phone #: ###-####
|
BLD-Framing/Rough-in | 6/29/2012 | 7/2/2012 | 7/2/2012 | A | PASS |
Jim Storey
|
|
|
James Phone #: ###-#### conf. ok
|
BLD-Framing/Rough-in | 6/7/2012 | 6/7/2012 | 6/7/2012 | P | PASS |
Jim Storey
|
|
|
joel Phone #: ###-#### interior of n and s stair enclosers fire stopped and ok to finsh gyp.
|
BLD-Framing/Rough-in | 5/23/2012 | 5/23/2012 | 5/23/2012 | P | PASS |
Jim Storey
|
|
|
joel Phone #: ###-#### fire collor assemblies instaled on backsde of 2hr fire wall core board. ok to cover chem side of wall.
|
BLD-Framing/Rough-in | 5/15/2012 | 5/16/2012 | 5/16/2012 | A | FAIL |
Jim Storey
|
|
|
Wall inspection please-Joel Phone #: ###-#### need firecollors on 3" pipes
|
BLD-Conference | 5/2/2012 | 5/3/2012 | 5/3/2012 | A | PASS |
Jim Storey
|
|
|
reviewed east stair enclosers for colum pertection that will be in gyp. inlew of splk aplacation. submital aproved and work ok to start to complet stairs on east end of bldg. 301
|
BLD-Other | 4/27/2012 | 4/30/2012 | 4/30/2012 | A | PASS |
Jim Storey
|
|
|
joel Phone #: ###-#### ne fire expantion joint ok to level 30/ framing ok on chem bldg./ exterior wall cover water protection 80 % wip ok.
|
BLD-Final | 4/23/2012 | 4/23/2012 | 4/23/2012 | A | PASS |
Jim Storey
|
|
|
first phase as noted on plan on site ok for temp occ.
|
FIRE-Final Inspection | 4/17/2012 | 4/17/2012 | 4/19/2012 | A | PART |
Forrest France
|
|
|
TCO only for "phase one" at portions of the sub-fab, photo bay and mechanical areas per agreement on record.
|
BLD-Other | 4/10/2012 | 4/12/2012 | 4/12/2012 | A | PART |
Jim Storey
|
|
|
joel Phone #: ###-#### ok for temp in first phase as noted. pending fire insp.
|
BLD-Other | 4/9/2012 | 4/10/2012 | 4/10/2012 | A | PART |
Jim Storey
|
|
|
Drop ceiling -- Joel Phone #: ###-#### cn list w/joel
|
BLD-Final | 4/4/2012 | 4/5/2012 | 4/9/2012 | P | NR |
Jim Storey
|
|
|
for temp//Joel Hartman Phone #: ###-####
|
FIRE-Final Inspection | 4/5/2012 | 4/6/2012 | 4/6/2012 | P | CANC |
Forrest France
|
|
|
Overbooked
|
FIRE-Final Inspection | 4/5/2012 | 4/5/2012 | 4/5/2012 | P | NR |
Forrest France
|
|
|
|
BLD-Final | 4/2/2012 | 4/3/2012 | 4/4/2012 | P | NR |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 3/30/2012 | 4/2/2012 | 4/2/2012 | P | NR |
Forrest France
|
|
|
|
BLD-Final | 3/30/2012 | 4/2/2012 | 4/2/2012 | P | DEFR |
Jim Storey
|
|
|
joel Phone #: ###-####
|
BLD-Final | 3/28/2012 | 3/29/2012 | 3/30/2012 | P | NR |
Jim Storey
|
|
|
joel Phone #: ###-#### fab level 20 exiting not ready.
|
BLD-Final | 3/27/2012 | 3/28/2012 | 3/28/2012 | P | PART |
Jim Storey
|
|
|
JOEL (TEMP OCC) Phone #: ###-#### c/n on stairs complet for gyp protection./ pending nw mez tube steel at fire alarm panel// fire door glazing to be instaled.
|
BLD-Final | 3/23/2012 | 3/26/2012 | 3/26/2012 | P | PART |
Jim Storey
|
|
|
Joel Phone #: ###-#### walk through temp exit path and requriments. list w/jol// walked throug with special insp as to temp sign off documantation.
|
BLD-Framing/Rough-in | 3/23/2012 | 3/23/2012 | 3/23/2012 | P | PART |
Jim Storey
|
|
|
joel Phone #: ###-#### wip on both stair enclosers
|
BLD-Framing/Rough-in | 3/19/2012 | 3/20/2012 | 3/20/2012 | A | PART |
Jim Storey
|
|
|
Joel-walls framing Phone #: ###-#### sw stair interior ok 2 locations membrane repair/ c/n to address 1604.9 as to atchment of raised floor sys to waffel deck.
|
BLD-Conference | 3/16/2012 | 3/16/2012 | 3/16/2012 | P | PART |
Jim Storey
|
|
|
meet with paul m. reviewed alternet stair provisions and fire spk submital w/fire planreview notes. Fire p.e. is on board with providing a clear submital back to the city. A adendem to clearify the aprovals grated by fire and bld officials for clearity will be also submited.
|
BLD-Wall cover | 3/12/2012 | 3/12/2012 | 3/12/2012 | P | NR |
Jim Storey
|
|
|
joel hartman
|
BLD-Wall cover | 3/8/2012 | 3/9/2012 | 3/9/2012 | A | PART |
Jim Storey
|
|
|
joel Phone #: ###-#### beam protection and firestopping on going in west n/s stair enclosers.
|
BLD-Conference | 3/8/2012 | 3/9/2012 | 3/9/2012 | A | PASS |
Jim Storey
|
|
|
to meet w/psp arch/micron arch/ contractor. resubmital to be drawn for east firebarior wall lines as well as locations of fire spk col. protection.
|
BLD-Wall cover | 3/8/2012 | 3/8/2012 | 3/8/2012 | A | PASS |
Jim Storey
|
|
|
3hr wall at dock s side gyp ok for cover/ fire expantion joint being instaled and will insp. fri.
|
BLD-Conference | 3/7/2012 | 3/7/2012 | 3/7/2012 | A | PART |
Jim Storey
|
|
|
reviewed 3 hr wall at dock reorintation of gyp in progress. walked north and south stairs beam wrap of vertical sopport north south side of encloser complet as well as lid at landing/ south fab level beam wrap in progress.
|
BLD-Conference | 3/5/2012 | 3/5/2012 | 3/5/2012 | P | PART |
Jim Storey
|
|
|
ask to walk stairs sw and nw/ will see if details for const. are avalable for review. reviewed ares to be protected with fb.
|
BLD-Conference | 3/2/2012 | 3/2/2012 | 3/2/2012 | A | PASS |
Jim Storey
|
|
|
review of vertacal protection locations and type of aplacation.mark up of all locations w/walk thru. to verify spk design to be submitted to the city.
|
BLD-Conference | 3/1/2012 | 3/1/2012 | 3/1/2012 | A | PASS |
Jim Storey
|
|
|
framing of coreboard ceilling of sw stair ok for aplacation of face gyp to be called in for atchment insp. upon starting progrestion.vertical shaftwall at top of sw stair at chase ok for cover./ 3 hr wall at link/dock of 24 reviewed as to how to instal per aproved details.
|
BLD-Conference | 2/29/2012 | 2/29/2012 | 2/29/2012 | P | DEFR |
Jim Storey
|
|
|
test to use insp. program w/hold on proj.
|
BLD-Conference | 1/31/2012 | 1/31/2012 | 2/6/2012 | P | PASS |
Jim Storey
|
|
|
|