Micron Building B50 - R&D Building - DEFERRED SUBMITTAL 2/24/12 Chemical Building Liquid Storage Room, H-2 occupancy, W/ minimum 2-hour fire-barrier wall separation between H-2 & H-5 occupancies, BLDG 50 R&D. To construct a new 111,005 square foot, two story, with 71,855 square foot basement, concrete and steel semiconductor fabrication R & D facility and related site improvements. The first floor level is 89, 435 sq. ft. The second level is a 21,570 sq. ft. equipment platform. The basement level (subfab.) has 71,855 sq. ft. finished. All construction per the approved plans and attached comment list. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/18/201212/20/201212/20/2012PPASS
DetailsJim Storey
steve Phone #: ###-####
FIRE-Final Inspection12/18/201212/19/201212/19/2012PPASS
DetailsForrest France
BLD-Conference10/1/201210/3/201210/3/2012APART
DetailsJim Storey
look at chem tray fire caulking to close outer opening in sheetrock. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes sdock side ok
BLD-Conference8/21/20128/22/20128/22/2012APASS
DetailsJim Storey
Firewall penetrations at the chem building. Phone #: ###-#### >> Inspection requested via web by Greg Kirkes
BLD-Final8/3/20128/6/20128/6/2012APASS
DetailsJim Storey
James Phone #: ###-#### phase 2 east half of bld50# phase 2 ok on temp.
BLD-Final8/2/20128/3/20128/6/2012PNR
DetailsJim Storey
James Phone #: ###-#### hardware needs instaled
FIRE-Final Inspection8/3/20128/3/20128/3/2012PPART
DetailsForrest France
"Phase two" area including K line east approved for temporary occupancy. Final pending finishes at the chemical building, project related FIR permit finals and noted correction items.
FIRE-Final Inspection8/2/20128/2/20128/3/2012PNR
DetailsForrest France
BLD-Final8/2/20128/2/20128/2/2012PNR
DetailsJim Storey
James Phone #: ###-####
FIRE-Final Inspection7/31/20128/1/20128/2/2012PNR
DetailsForrest France
James Phone #: ###-#### - life saety
BLD-Framing/Rough-in7/18/20127/19/20127/19/2012ANR
DetailsJim Storey
Phone #: 36088231 >> Inspection requested via mobile web by rustin
BLD-Conference7/11/20127/12/20127/12/2012APART
DetailsJim Storey
JOEL Phone #: ###-#### east n/s stair fire riser rm fire stop fan protection/
BLD-Other7/9/20127/10/20127/11/2012ADEFR
DetailsJim Storey
JOEL Phone #: ###-####
BLD-Framing/Rough-in6/29/20127/2/20127/2/2012APASS
DetailsJim Storey
James Phone #: ###-#### conf. ok
BLD-Framing/Rough-in6/7/20126/7/20126/7/2012PPASS
DetailsJim Storey
joel Phone #: ###-#### interior of n and s stair enclosers fire stopped and ok to finsh gyp.
BLD-Framing/Rough-in5/23/20125/23/20125/23/2012PPASS
DetailsJim Storey
joel Phone #: ###-#### fire collor assemblies instaled on backsde of 2hr fire wall core board. ok to cover chem side of wall.
BLD-Framing/Rough-in5/15/20125/16/20125/16/2012AFAIL
DetailsJim Storey
Wall inspection please-Joel Phone #: ###-#### need firecollors on 3" pipes
BLD-Conference5/2/20125/3/20125/3/2012APASS
DetailsJim Storey
reviewed east stair enclosers for colum pertection that will be in gyp. inlew of splk aplacation. submital aproved and work ok to start to complet stairs on east end of bldg. 301
BLD-Other4/27/20124/30/20124/30/2012APASS
DetailsJim Storey
joel Phone #: ###-#### ne fire expantion joint ok to level 30/ framing ok on chem bldg./ exterior wall cover water protection 80 % wip ok.
BLD-Final4/23/20124/23/20124/23/2012APASS
DetailsJim Storey
first phase as noted on plan on site ok for temp occ.
FIRE-Final Inspection4/17/20124/17/20124/19/2012APART
DetailsForrest France
TCO only for "phase one" at portions of the sub-fab, photo bay and mechanical areas per agreement on record.
BLD-Other4/10/20124/12/20124/12/2012APART
DetailsJim Storey
joel Phone #: ###-#### ok for temp in first phase as noted. pending fire insp.
BLD-Other4/9/20124/10/20124/10/2012APART
DetailsJim Storey
Drop ceiling -- Joel Phone #: ###-#### cn list w/joel
BLD-Final4/4/20124/5/20124/9/2012PNR
DetailsJim Storey
for temp//Joel Hartman Phone #: ###-####
FIRE-Final Inspection4/5/20124/6/20124/6/2012PCANC
DetailsForrest France
Overbooked
FIRE-Final Inspection4/5/20124/5/20124/5/2012PNR
DetailsForrest France
BLD-Final4/2/20124/3/20124/4/2012PNR
DetailsJim Storey
FIRE-Final Inspection3/30/20124/2/20124/2/2012PNR
DetailsForrest France
BLD-Final3/30/20124/2/20124/2/2012PDEFR
DetailsJim Storey
joel Phone #: ###-####
BLD-Final3/28/20123/29/20123/30/2012PNR
DetailsJim Storey
joel Phone #: ###-#### fab level 20 exiting not ready.
BLD-Final3/27/20123/28/20123/28/2012PPART
DetailsJim Storey
JOEL (TEMP OCC) Phone #: ###-#### c/n on stairs complet for gyp protection./ pending nw mez tube steel at fire alarm panel// fire door glazing to be instaled.
BLD-Final3/23/20123/26/20123/26/2012PPART
DetailsJim Storey
Joel Phone #: ###-#### walk through temp exit path and requriments. list w/jol// walked throug with special insp as to temp sign off documantation.
BLD-Framing/Rough-in3/23/20123/23/20123/23/2012PPART
DetailsJim Storey
joel Phone #: ###-#### wip on both stair enclosers
BLD-Framing/Rough-in3/19/20123/20/20123/20/2012APART
DetailsJim Storey
Joel-walls framing Phone #: ###-#### sw stair interior ok 2 locations membrane repair/ c/n to address 1604.9 as to atchment of raised floor sys to waffel deck.
BLD-Conference3/16/20123/16/20123/16/2012PPART
DetailsJim Storey
meet with paul m. reviewed alternet stair provisions and fire spk submital w/fire planreview notes. Fire p.e. is on board with providing a clear submital back to the city. A adendem to clearify the aprovals grated by fire and bld officials for clearity will be also submited.
BLD-Wall cover3/12/20123/12/20123/12/2012PNR
DetailsJim Storey
joel hartman
BLD-Wall cover3/8/20123/9/20123/9/2012APART
DetailsJim Storey
joel Phone #: ###-#### beam protection and firestopping on going in west n/s stair enclosers.
BLD-Conference3/8/20123/9/20123/9/2012APASS
DetailsJim Storey
to meet w/psp arch/micron arch/ contractor. resubmital to be drawn for east firebarior wall lines as well as locations of fire spk col. protection.
BLD-Wall cover3/8/20123/8/20123/8/2012APASS
DetailsJim Storey
3hr wall at dock s side gyp ok for cover/ fire expantion joint being instaled and will insp. fri.
BLD-Conference3/7/20123/7/20123/7/2012APART
DetailsJim Storey
reviewed 3 hr wall at dock reorintation of gyp in progress. walked north and south stairs beam wrap of vertical sopport north south side of encloser complet as well as lid at landing/ south fab level beam wrap in progress.
BLD-Conference3/5/20123/5/20123/5/2012PPART
DetailsJim Storey
ask to walk stairs sw and nw/ will see if details for const. are avalable for review. reviewed ares to be protected with fb.
BLD-Conference3/2/20123/2/20123/2/2012APASS
DetailsJim Storey
review of vertacal protection locations and type of aplacation.mark up of all locations w/walk thru. to verify spk design to be submitted to the city.
BLD-Conference3/1/20123/1/20123/1/2012APASS
DetailsJim Storey
framing of coreboard ceilling of sw stair ok for aplacation of face gyp to be called in for atchment insp. upon starting progrestion.vertical shaftwall at top of sw stair at chase ok for cover./ 3 hr wall at link/dock of 24 reviewed as to how to instal per aproved details.
BLD-Conference2/29/20122/29/20122/29/2012PDEFR
DetailsJim Storey
test to use insp. program w/hold on proj.
BLD-Conference1/31/20121/31/20122/6/2012PPASS