BLD-Final | 9/19/2011 | 9/20/2011 | 9/20/2011 | A | PASS |
Mike Jordan
|
|
|
Adam Phone #: ###-####
|
DOC - Permit Finaled | 9/20/2011 | 9/20/2011 | 9/20/2011 | P | PASS |
Mike Jordan
|
|
|
All issues were resolved. Residential certificate of occupancy was issued.
|
BLD-Final | 9/7/2011 | 9/8/2011 | 9/8/2011 | A | FAIL |
Mike Jordan
|
|
|
adam Phone #: ###-####. Open mech. permit, Provide CO2 detector outside masterbedroom, provide energy cert, also needs to complete final grading.
|
BLD-Energy code compliance | 7/15/2011 | 7/18/2011 | 7/18/2011 | A | PASS |
Mike Jordan
|
|
|
Adam Phone #: ###-####
|
BLD-Framing/Rough-in | 7/14/2011 | 7/15/2011 | 7/15/2011 | A | PASS |
Mike Jordan
|
|
|
ADAM Phone #: ###-####
|
BLD-Energy code compliance | 7/15/2011 | 7/15/2011 | 7/15/2011 | A | PASS |
Mike Jordan
|
|
|
ADAM Phone #: ###-####
|
BLD-Framing/Rough-in | 7/13/2011 | 7/13/2011 | 7/13/2011 | A | FAIL |
Mike Jordan
|
|
|
ADAM Phone #: ###-####. Fireblock area at coffered ceilings at main enterane. Provide the additional straps at garage as shown for portal frame holdown. Correction notice was posted. ok to insulate.
|
BLD-Framing/Rough-in | 7/7/2011 | 7/7/2011 | 7/7/2011 | P | NR |
Mike Jordan
|
|
|
josh Phone #: ###-####. Needs to complete air seal package prior to framing inspection.
|
BLD-Foundation | 6/7/2011 | 6/10/2011 | 6/10/2011 | A | PART |
Mike Jordan
|
|
|
BILL Phone #: ###-####
|
BLD-Footing | 6/8/2011 | 6/9/2011 | 6/9/2011 | A | PART |
Mike Jordan
|
|
|
Bill Phone #: ###-####
|
BLD-Footing | 6/7/2011 | 6/8/2011 | 6/8/2011 | P | NR |
Mike Jordan
|
|
|
BILL Phone #: ###-####. No one on site, no forms have been constructed.
|