BLD-Final | 9/27/2011 | 9/29/2011 | 9/29/2011 | P | PASS |
Dave Hannah
|
|
|
John Phone #: ###-#### ok for perm occ
|
FIRE-Final Inspection | 9/27/2011 | 9/29/2011 | 9/29/2011 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. The maintenance chief and I spoke about the importance of getting the annual testing performed on the building fire alarm system.
|
BLD-Framing/Rough-in | 8/23/2011 | 8/23/2011 | 8/23/2011 | A | PASS |
Dave Hannah
|
|
|
john - please coordinate with dixie Phone #: ###-#### ok to install fire dampers
|
BLD-Framing/Rough-in | 8/22/2011 | 8/22/2011 | 8/23/2011 | P | PART |
Dave Hannah
|
|
|
john - please coordinate with dixie Phone #: ###-#### still working on framing for fire dampers
|
BLD-Final | 7/13/2011 | 7/14/2011 | 7/15/2011 | P | PART |
Dave Hannah
|
|
|
requesting temp final as per meeting of last week. Phone #: ###-#### >> Inspection requested via web by John Lodman ok for temp occ pending completion of corridor rating work as per upgrade agreement.
|
FIRE-Final Inspection | 7/13/2011 | 7/14/2011 | 7/14/2011 | P | PASS |
Forrest France
|
|
|
Fire life safety passed.
|
BLD-Other | 7/11/2011 | 7/11/2011 | 7/11/2011 | P | PART |
Dave Hannah
|
|
|
request approval to cover tenant side of rated wall. fire/smoke dampers required by plan mod will be implemented after TCO as per 7/8 conference with Storey and Forrest France. perimeter clips will be installed with ceiling tile. please call. thank you. Phone #: ###-#### >> Inspection requested via web by John Lodman Ok to cover
|
BLD-Other | 6/28/2011 | 6/28/2011 | 6/28/2011 | P | PART |
Dave Hannah
|
|
|
john - ###-#### - ceiling cover ok to cover
|
BLD-Framing/Rough-in | 6/24/2011 | 6/27/2011 | 6/27/2011 | A | PART |
Dave Hannah
|
|
|
field conditions for rated wall along exit corridor please. Phone #: ###-#### >> Inspection requested via web by John Lodman ok to cover new section of corrador wall above ceilings
|
BLD-Framing/Rough-in | 6/23/2011 | 6/24/2011 | 6/24/2011 | A | DEFR |
Dave Hannah
|
|
|
field conditions for rated wall along exit corridor please. Phone #: ###-#### >> Inspection requested via web by John Lodman
|
BLD-Conference | 6/17/2011 | 6/20/2011 | 6/23/2011 | A | PASS |
Dave Hannah
|
|
|
call john ###-#### plan reveiw and arch are working on project
|
BLD-Conference | 6/16/2011 | 6/17/2011 | 6/17/2011 | A | PART |
Tom Arcoraci
|
|
|
need to discuss corridor wall between new rated section and stairwell tower as per your voice mail of 6/16. thank you Phone #: ###-#### >> Inspection requested via web by John Lodman will talk to dave on monday
|
BLD-Wall cover | 6/15/2011 | 6/16/2011 | 6/16/2011 | A | PART |
Dave Hannah
|
|
|
wall cover only- wall bracing w/ ceiling inspection please. electrical inspection pending, no plumbing. thank you. Phone #: ###-#### >> Inspection requested via web by John Lodman ok to cover int walls
|
FIRE-Conference | 6/13/2011 | 6/14/2011 | 6/14/2011 | P | DONE |
Forrest France
|
|
|
On site meeting with contractor regarding fire life safety issues, review notes, red-line annotations, project related fire sprinkler permit work, existing fire alarm system, fire extinguisher locations, exit signage/EM lighting, accessibility upgrades.
|