FIRE-Final Inspection | 8/9/2011 | 8/10/2011 | 8/10/2011 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
BLD-Final | 8/10/2011 | 8/10/2011 | 8/10/2011 | P | PASS |
Dave Hannah
|
|
|
tim - please call to confirm approval Phone #: ###-####
|
DOC - Permit Finaled | 8/10/2011 | 8/10/2011 | 8/10/2011 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 8/9/2011 | 8/9/2011 | 8/9/2011 | P | PASS |
Forrest France
|
|
|
Fire life safety inspection completed satisfactory.
|
BLD-Other | 7/26/2011 | 7/27/2011 | 7/27/2011 | A | PASS |
Dave Hannah
|
|
|
ceiling cover insp//Tim Phone #: ###-####
|
BLD-Other | 7/20/2011 | 7/21/2011 | 7/21/2011 | P | CANC |
Dave Hannah
|
|
|
Ceiling cover---Tim Phone #: ###-####
|
FIRE-Conference | 7/12/2011 | 7/12/2011 | 7/12/2011 | P | DONE |
Forrest France
|
|
|
On site conference regarding existing building fire alarm and sprinkler systems and related modifications due to remodel work.
|
BLD-Energy code compliance | 7/11/2011 | 7/12/2011 | 7/12/2011 | P | PASS |
Dave Hannah
|
|
|
tim Phone #: ###-####
|
BLD-Framing/Rough-in | 7/7/2011 | 7/7/2011 | 7/7/2011 | P | PASS |
Tom Arcoraci
|
|
|
Tim-PLease call at least 30 mins prior to inspection Phone #: ###-#### ok to insulate
|
BLD-Foundation | 6/27/2011 | 6/28/2011 | 6/28/2011 | A | PASS |
Dave Hannah
|
|
|
tim Phone #: ###-####
|
BLD-Footing | 6/27/2011 | 6/27/2011 | 6/27/2011 | P | PASS |
Dave Hannah
|
|
|
Tim Phone #: ###-####
|