BLD-Final | 10/24/2011 | 10/25/2011 | 10/25/2011 | A | PASS |
Mike Jordan
|
|
|
adam - please call for access Phone #: ###-####
|
DOC - Permit Finaled | 10/25/2011 | 10/25/2011 | 10/25/2011 | P | PASS |
Mike Jordan
|
|
|
Residential certificate of occupancy was issued.
|
BLD-Energy code compliance | 9/7/2011 | 9/8/2011 | 9/8/2011 | A | PASS |
Mike Jordan
|
|
|
Adam Phone #: ###-####
|
BLD-Framing/Rough-in | 8/31/2011 | 9/1/2011 | 9/1/2011 | A | PASS |
Mike Jordan
|
|
|
adam Phone #: ###-####. All issues have been resolved . Ok to insulate.
|
BLD-Framing/Rough-in | 8/31/2011 | 8/31/2011 | 8/31/2011 | P | FAIL |
Mike Jordan
|
|
|
Adam Phone #: ###-####. Com plete encapsulation of knee walls on bonus room trusses, Complete work on PFH framing. Correction notice posted.
|
BLD-Framing/Rough-in | 8/24/2011 | 8/25/2011 | 8/25/2011 | A | FAIL |
Mike Jordan
|
|
|
Adam Phone #: ###-####. Provide portal framing at garage and den as per detail 5 on sheet A5.1 on approved plans, knee wall on bonus room trusses need to be encapsulated on all six sides. Correction notice posted. Do not insulate.
|
BLD-Framing/Rough-in | 8/23/2011 | 8/24/2011 | 8/24/2011 | A | NR |
Mike Jordan
|
|
|
adam Phone #: ###-####. Airseal package not completed.
|
BLD-Footing | 7/20/2011 | 7/20/2011 | 7/20/2011 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Footing | 7/19/2011 | 7/20/2011 | 7/20/2011 | A | CANC |
Mike Jordan
|
|
|
bill Phone #: ###-####. moved to pm.
|
BLD-Footing | 7/14/2011 | 7/15/2011 | 7/15/2011 | P | CANC |
Mike Jordan
|
|
|
BILL Phone #: ###-####-Contractor called in to called @ 11:57//BAS
|
BLD-Foundation | 7/12/2011 | 7/14/2011 | 7/14/2011 | P | CANC |
Mike Jordan
|
|
|
bill Phone #: ###-####
|
BLD-Footing | 7/12/2011 | 7/13/2011 | 7/14/2011 | P | NR |
Mike Jordan
|
|
|
bill Phone #: ###-####. Needs to locate pins for property lines.
|